
Page 12
Step 10: Begin to route the Upper Cables by starting with the left preassembled Upper Cable and pulling
it through Pulley 1 and around Pulley 3 of the left floating pulley. Continue through the Upper
Pulley Mount, Left and then back down to the Top Weight Stack.
Repeat for the other side with Pulley 2, Pulley 4 and the Upper Pulley Mount, Right.
NOTE:
Insert Lower Cable into Hex Bolt and Jam Nut as shown above.
Step 10
Floating Pulley
Upper Cable Installation
Pulley 1
Pulley 2
Pulley 3
Pulley 4
Upper Pulley
Mount, Left
Upper Pulley
Mount, Right
Thread bolt completely into selector
stem and tighten jam nut
Cable
Selector Stem
Jam Nut
DUAL LINE LAT/ROW CABLE CHART
Cable lengths are in millimeters and for reference only.
Cable lengths could change at any time without notice.
Upper Cable p/n GM883-500-003
Guide Cable p/n GM883-500-001
Lower Cable p/n GM883-500-002
Upper Cable
Содержание Dual Lat/Row
Страница 7: ...ASSEMBLY INSTRUCTIONS Page 4...
Страница 25: ...877 738 1729 DECAL REFERENCE PAGE 22 8 870 718...
Страница 26: ...Page 23 DECAL REFERENCE...