background image

8

(FNA2)

L3

L1

L2

L3

| ON

|  OFF

4

GROUND

H1

H3

H2

H4

X2

XF

FUSE

2

3

4

5

NC

M1

M2

M3

3

6

6

2

L1

INCOMING

L2

L1

L2

L3

M1

M2

5

6

6

5

5

4

4

L2

L1

DISPOSER

 MOTOR

OPTIONAL

SOLENOID

 VALVE

START

STOP

M3

NC

MODEL NO. MSLV-8

380-460w, 3 Ø, ½-10 HP

PART NO. 14186C

NEMA 4

IN-SINK-ERATOR DIVISION

EMERSON ELECTRIC CO.

4700 21ST STREET

RACINE, WI. 53406-5093

Wiring Diagrams

ELECTRIC SHOCK

• Turn off the electrical supply to the disposer before 

attempting any work on it. Use a voltmeter or 
circuit tester to ensure that the power is off.

• Installation must conform with local electrical 

codes.

• All control centers and disposers must be carefully 

and permanently grounded.

• A properly-fused disconnect must be installed at 

the electrical supply source for the control center.

PROPERTY DAMAGE

• Ensure that the control center voltage and phase 

match the disposer motor and electrical supply. 
Check nameplates on disposers and control 
centers for voltage and phase specification.

• The disposer motor wiring connection is shown in 

the disposer terminal box.

Note:  •  Red wires = Low Voltage (24 V) control
 

•  Black wires = Line voltage (380 – 460 V) control

Model MSLV

380 – 460 V

3 Ø

1/2 to 10 hp

Call Toll Free 1-800-845-8345 
for the nearest In-Sink-Erator 
Authorized Service Center or 
to reach Technical Support.

Figure 8. 380 – 460 V, 3 Ø,  ½ to 10 hp Wiring Diagram

Содержание MSLV

Страница 1: ...contained in this manual The Danger signal indicates an immediately hazardous situation which if not avoided will result in death or serious injury The Warning signal alerts you to potential hazards...

Страница 2: ...27 SS200 31 MSLV 3 MSLV 4 SS50 27 SS75 28 SS100 29 SS125 26 SS150 36 SS150 39 SS200 29 SS200 32 SS300 25 SS300 27 SS500 28 SS500 30 SS750 13 SS750 15 SS1000 10 SS1000 12 Figure 1 Control center dimen...

Страница 3: ...plates on disposer and control centers for voltage and phase speci cations Refer to the control center wiring diagrams in this manual for correct connection Use NEMA 4 watertight electrical connectors...

Страница 4: ...he disposer TO STOP 1 Push stop button Disposer motor and water will stop NOTE If time delay relay is used the water may continue to ow into disposer for up to 10 minutes Troubleshooting ELECTRICAL SH...

Страница 5: ...ser before attempting any work on it Use a voltmeter or circuit tester to ensure that the power is off Installation must conform with local electrical codes All control centers and disposers must be c...

Страница 6: ...odes All control centers and disposers must be carefully and permanently grounded A properly fused disconnect must be installed at the electrical supply source for the control center PROPERTY DAMAGE E...

Страница 7: ...o the disposer before attempting any work on it Use a voltmeter or circuit tester to ensure that the power is off Installation must conform with local electrical codes All control centers and disposer...

Страница 8: ...ectrical codes All control centers and disposers must be carefully and permanently grounded A properly fused disconnect must be installed at the electrical supply source for the control center PROPERT...

Отзывы: