![Inscape Data Link Power LPS1000 Скачать руководство пользователя страница 53](http://html1.mh-extra.com/html/inscape-data/link-power-lps1000/link-power-lps1000_user-manual_2065277053.webp)
LinkPower
LPS1000 Adjustable Voltage PoE Switch
Page 53 of 71
3.4.3 PoE Control
You may monitor port voltage and link status as well as execute port restart. Port restart
will power cycles the port and the connected power device. The table below references
the status of each port.
Item
Description
PoE Power Level
Available Power Display Are: 0VDC, 12VDC,
24VDC, 48VDC, and 802.3af
Link Status
Green = Link On
Grey = Link Off
Port Restart
Clicking on the Restart Button Will Execute
One Power Cycle. One Power Cycle
Simulates a Power Off for 3 Seconds and
Power On Again.
Refresh
Click on Refresh Button if Your Web Browser
Did Not Automatically Refresh the Page After
a Port Restart.