2021/11
4.Installation
11
4.5.
DOUBLE MECHANICAL SEAL
Models with double mechanical seal may require the installation of auxiliary cooling circuit for them. As shown in next
figure, will be assembled the inlet connection on the bottom and the outlet on the top ensuring that the chamber is
full of liquid.
4.6.
ELECTRICAL INSTALLATION
Only qualified personnel can connect the electric motors.
Take the necessary measures to prevent damage to cables and connections.
Electrical equipment, terminals and components of the control systems may still carry current when they
are disconnected. Contacting them may impose a hazard to operators or cause irreparable material
damage.
Prior to handling the blender, make sure that the electrical panel is disconnected.
•
Connect the motor in accordance with the instructions supplied by the motor manufacturer.
•
Check the direction of rotation.
The recommended flow of cooling liquid is around 0,25-0,6 l/min and a working pressure of 0-1 bar.
ALWAYS connect the cooling inlet on the bottom connection of the seal chamber and the outlet connection
on the top.
02
.1
00
.3
2.
00
05