29
Plan of maintenance jobs
1.
After first two hours of work always:
•
Check the belt tension,
•
Check that all bolts and taper locks are tightened enough
Do the same also after each belt changing.
2.
After every 8 hours always check:
•
That the nuts are tightened enough,
•
A wear and condition of working tools,
•
Belts and taper locks
,
•
A condition of safe guards,
•
Oil level in the gearbox,
•
That any foreign parts are not stuck on the rotor shaft,
•
That the frame and the 3-point hitch are in good condition,
•
That all parts are greased well.
3.
Every 100 hours we recommend to:
•
Check and grease the PTO shaft
4.
Every 12 months we recommend to:
•
Change the oil in the gearbox and check the belts tension.
Replacement of working tools
Immediately after you notice that working tools are damaged, change
them. If it is necessary to change only few blades, always change the bro-
ken or worn one and the one diametrically opposite in order to maintain
the balance. If the rotor shaft is vibrating after changing the blades, imme-
diately stop the machine. The machine must be balanced before any work.