![innove duralam INTEGRA Скачать руководство пользователя страница 21](http://html1.mh-extra.com/html/innove/duralam-integra/duralam-integra_operating-instructions-manual_2064102021.webp)
21
OPERATING
fILM LOADING Continued
sTEP 5 - film Threading Continued
• Pull bottom film under bottom idler bar and up over
heat rollers and tape together. Move bottom idle bar
up slot to run position (Refer to Figures 15-17,
Diagram 17a, Figures 18-20).
fIGuRE 16
(Pull bottom film under idle bar
and drape over top film}
fIGuRE 15
(Slide bottom idle bar down slot
to loading position)
fIGuRE 17
(Apply tape to film to hold
film together)
fIGuRE 19
(Push idle bar to run position)
fIGuRE 20
(Idle bar shown in run position)
fIGuRE 18
TAPE
RuN POsITION
FIGURE 17A
(Pull top film under top idle roller
then pull bottom film under bottom idler)
Tape
Here
Содержание duralam INTEGRA
Страница 1: ...OPERATING INSTRUCTIONS ...
Страница 2: ......
Страница 4: ...4 ...
Страница 6: ...6 ...
Страница 8: ...8 ...
Страница 10: ...10 ELECTRICAL SCHEMATICS Electrical Schematics 120 Volt ...
Страница 12: ...12 ...
Страница 29: ...29 ...
Страница 30: ...30 ...