
MU8012-002ANG Rev2 2016
P. 14
4.
A.
Inser t extension on the fr ont of the
platform.
B.
Lock with the pin.
C.
If necessar y, adjust the angle +/- 5 degrees.
D.
Lock angle with pin.
OPERATION AND INSTALLATION OF T-SHAPED BASE SYSTEM WITH BALLAST (A2305
-65)
1.
Make sure that all components
and pieces are in perfect working
condition and that everything is
functioning correctly.
IN-2237
IN-2305
A2305-40
A2305-65
IN-2240
2.
A.
Assemble the two parts of the tank platform.
B.
Attach the two parts of the platform with pin.
3.
Attach the water tank with the 4 pins
situated on the edges of the platform.
Содержание IN-8012
Страница 22: ...MU8012 002ANG Rev2 2016 P 21...
Страница 26: ...MU8012 002ANG Rev2 2016 P 25 8 Calculation diagram...