1.9
START-UP REQUIREMENTS
Before starting, make sure that there are no foreign bodies inside the unit.
Check the fastening of the closing panels and inspection doors.
If there are no channels installed on the aeraulic sockets, install an adequate protection net.
Check the power supply and grounding of the unit.
1.10 DISASSEMBLY AND DISPOSAL
Do not disassemble or dispose of the product yourself.
Disassembly, demolition, disposal of the product must be carried out by authorized personnel in compliance with local regulations.
1.11 MAIN COMPONENTS UNITS
The main components of the unit are described below in order to understand the layout and characteristics of the machine.
1 Fan
2 Hydronic battery
3 Filter
4 Electrical connection box
5 Hydraulic connections
6 Condensate drain