![Innolas Laser nanio Series Скачать руководство пользователя страница 35](http://html1.mh-extra.com/html/innolas-laser/nanio-series/nanio-series_user-and-installation-manual_2062634035.webp)
7. Installation
Important!
If you have any questions or problems during the integration contact InnoLas
support.
7.1. Unpacking
1. Transport the equipment carefully. Do not subject it to excessive shock or
2. Carefully unpack all the packages and check the components against the parts list
supplied. Notify any shortages or damage to the shipping company and to InnoLas
immediately.
3. Remove the packaging from the laser head, power supply and chiller. Keep the
packing materials for use when transporting the system to the final destination.
7.2. Positioning and mechanical mounting
Important!
The nanio system must not be installed in an environment with conductive dust
or condensation.
Important!
Ensure that all parts of the system are securely fixed to withstand vibrations.
Important!
Position all components so that the type label is clearly visible.
DANGER
Risk of electrocution or damage to equipment
Position electrical equipment in such a way that no water can leak into it.
Do not position the chiller or laser head above the power supply or any other
electrical equipment in case of water leakage.
nanio Industrial DPSS Laser User and Installation Manual
27
7. Installation
Содержание nanio Series
Страница 6: ......
Страница 8: ...InnoLas Laser GmbH Preface ii...
Страница 14: ...InnoLas Laser GmbH 1 Safety 6...
Страница 18: ...2 6 2 Dimensions Figure 11 490 mm head InnoLas Laser GmbH 2 General Description 10...
Страница 19: ...Figure 12 590 mm head nanio Industrial DPSS Laser User and Installation Manual 11 2 General Description...
Страница 22: ...InnoLas Laser GmbH 2 General Description 14...
Страница 28: ...InnoLas Laser GmbH 4 Software 20...
Страница 34: ...InnoLas Laser GmbH 6 Troubleshooting 26...
Страница 40: ...InnoLas Laser GmbH 7 Installation 32...
Страница 48: ...InnoLas Laser GmbH 40...