background image

18

Fire detection and extinguishant system

Centobuchi, via Dei Lavoratori 10

63076 Monteprandone (AP) Italy

Tel. +39 0735 705007 _ Fax +39 0735 704912

[email protected] 

_ www.inim.biz

ISO 9001 Quality Management

certified by BSI with certificate number FM530352

Содержание Praesidia series

Страница 1: ...Guide to networking 1 FIRE DETECTION AND EXTINGUISHANT SYSTEM EN 54 2 EN 54 4 EN 54 21 EN 12094 1 0832 0832 CPR F1342 cert N 991K GUIDE TO NETWORKING...

Страница 2: ...en goods or claims by any other party caused by defective products or otherwise arising from the incorrect or otherwise improper installation or use of this product This warranty applies only to defec...

Страница 3: ...3 2 Use of optic fiber connections 8 3 3 Supervision of the Hornet network 8 3 4 Commissioning of a Hornet network 8 3 5 Sharing the events on the Hornet network 10 3 6 Activation of groups of outputs...

Страница 4: ...4 Table of contents Fire detection and extinguishant system...

Страница 5: ...ve Below Directions as seen by the operator when directly in front of the mounted device Qualified personnel Persons whose training expertise and knowledge of the products and laws regarding security...

Страница 6: ...various nodes the supervision of the entire network by connecting to a single node it is possible to supervise the entire network by means of the appropriate supervision software e g supervisory softw...

Страница 7: ...imum length 1000m between two successive control panels Compliant with local laws and regulations in force The connection must be a loop connection and must respect the direction of the wiring the ter...

Страница 8: ...he IFMNET module all the other nodes in the network will signal the fault 3 4 Commissioning of a Hornet network Once several control panels have been connected in a Hornet network as indicated in the...

Страница 9: ...he network As soon as a Hornet address is assigned the IFMNET module activates the blue LED to indicate that the control panel is in the cluster and has started to communicate with the other control p...

Страница 10: ...ine which events from other control panels are to be displayed for each node of the Hornet network by duly configuring the Events filter section This section can be reached by selecting a control pane...

Страница 11: ...ated in the parameters section of the selected group B the group will be the same for all the control panels in Hornet network The outputs associated with the group will activate regardless of control...

Страница 12: ...ifferent paths and to take all the necessary precautions to ensure that the Ethernet physical layer provides fully secure and redundant capabilities 4 3 Supervision of the TCP IP network Once the TCP...

Страница 13: ...eration in order to communicate to each component in the network the existence of all the other elements 11 To set the programming of the entire installation click on the Write button This operation m...

Страница 14: ...f the repeater is 0 To do this it is necessary to access the Programming section as indicated above then access the Configuration section The configuration process continues through the control pane p...

Страница 15: ...P address for the repeater 11 In the same list first click on the cluster the repeater is associated with L and then on the relative control panel underneath M 12 In the column on the right in the row...

Страница 16: ...nguishant system Centobuchi via Dei Lavoratori 10 63076 Monteprandone AP Italy Tel 39 0735 705007 _ Fax 39 0735 704912 info inim biz _ www inim biz ISO 9001 Quality Management certified by BSI with ce...

Отзывы: