0
Index
1. Overview
17
1.1 Introduction
17
1.2 Description of the equipments
17
1.2.1 Models
17
1.2.2 Options
17
1.3 Technical data
18
1.4 Ratings
18
1.5 Compliance with Standards
21
2. Description of the system
22
2.1 Location
22
2.1.1 Site
22
2.1.2 NEMA rating
22
2.1.3 Ambient temperature
22
2.1.4 Atmospheric conditions
23
2.1.5 Ventilation
23
2.1.6 Contamination rating
24
2.1.7 Noise contamination
24
2.1.8 Anchorage
24
2.2 Ground Requirements
25
2.3 System neutral requirements
25
2.4 Electrical Diagrams
25
2.5 Conduit Entry
27
3. Operating, storage and transport conditions
29
3.1 Safety notice
29
3.2 Equipment reception
29
3.3 Handling and unpacking
30
3.4 Equipment transport
31
3.5 Storage
32
3.6 Conservation
32
3.7 Waste disposal
33
4. Safety instructions
34
4.1 Contents
34
4.2 Symbols
34
4.3 General safety conditions
35
4.4 General observations
36
4.4.1 Hazards present and general preventive measures
37
4.4.2 Hazards and additional measures in manipulation work
37
4.5 Type of tasks to be performed
38
4.5.1 Inspection tasks
38
4.5.2 Operational tasks
38
4.5.3 Manipulation tasks
38
4.5.4 Personal Protection Equipment (PPE)
39
Installation and Operation Manual
INGECON
®
SUN SMART U
AAS2000IKI05
AAS2000IKI05
Rev. _
Date: February 2011
Page 15