Sequence of Operation
18
RT-SVF28F-EN
energizes the second stage of the gas valve and the second
stage of inducer blower.
When the zone thermostat is satisfied, the (IGN) de-
energizes the gas valve. The (IGN) senses loss of flame.
The (IGN) initiates a 5 second inducer blower post purge
and 90 second indoor blower delay off at current speed.
The (IGN) de-energizes the inducer blower at the end of the
post purge. The (IGN) de-energizes the indoor blower at
the end of the selected indoor blower delay off.
Drain Pan Condensate Overflow Switch
(Optional)
The Condensate Overflow Switch (COF) is utilized to
prevent water overflow from the drain pan. The float
switch is installed on the corner lip of the drain pan. When
the condensate level reaches the trip point, the COF relay
energizes and opens the 24VAC control circuit which
disables the unit. Once the 24VAC control circuit is opened,
a delay timer will prevent unit start-up for three minutes.
Table 20.
Ignition module diagnostics
Steady light
Module is powered up, but no active call for
heat.
Blinking at
continuous steady
rate
Active call for heat.
One blink
Loss of communication.
Two blinks
System lockout (failure to ignite, no spark,
low/no gas pressure, etc.)
Three blinks
Pressure switch (no vent air flow, bad CBM,
closed at initial call for heat). Auto reset.
Four blinks
High limit (excessive heat in combustion
chamber, low airflow). Auto reset.
Five blinks
Flame sensed and gas valve not energized
or flame sensed and no call for heat.
Six blinks
Flame rollout (CBM failure, incorrect gas
pressure, incorrect primary air). Requires
manual reset of the switch.
Seven blinks
W1& W2 swapped (electromechanical 3-10
tons units).
Содержание Precedent TSC120F Series
Страница 20: ...20 RT SVF28F EN Subcooling Charging Chart Figure 3 T YSC120F subcooling charging chart PSIG SYS 1 SYS 2...
Страница 21: ...RT SVF28F EN 21 Refrigerant Circuit Figure 4 T YSC120F...
Страница 22: ......
Страница 23: ......