![Inge dizzer L 40 PB Скачать руководство пользователя страница 43](http://html1.mh-extra.com/html/inge/dizzer-l-40-pb/dizzer-l-40-pb_assembly-instructions-manual_2058530043.webp)
Loading / Assembly
dizzer
®
L Series horizontal
– Assembly Instructions 2.2(2019-06) E inge
Page 43 of 60
© inge GmbH
5.6
Loading of dizzer
®
L 55 in a Pressure Vessel
NOTE
For proper loading of the dizzer
®
L modules in pressure vessels at
least 2 people are required.
5.6.1
Preparation before Module Loading
Step
Activity
Figure
1
Prepare the module
Position the module vertically. Carefully remove the tape
and the yellow protecting cap from the top module end.
Avoid the use of any sharp instrument that might cause
damage of the module.
2
Drain module from possible excess preservative solution
a)
Turn the module around, and place the open end in a clean
drain tray / tub and carefully remove the tape and the
yellow protecting cap from the upper module end. Take
care to
avoid contact of the UF element’s front ends with
contaminated surfaces
b)
Some excess preservative solution can drain from the
module, and should be collected in the drain tray / tub
c)
Let the module empty for some minutes (typically 5 min.)
d)
Store the modules horizontally on a clean surface