![Inge dizzer L 40 PB Скачать руководство пользователя страница 42](http://html1.mh-extra.com/html/inge/dizzer-l-40-pb/dizzer-l-40-pb_assembly-instructions-manual_2058530042.webp)
Loading / Assembly
dizzer
®
L Series horizontal
– Assembly Instructions 2.2(2019-06) E inge
Page 42 of 60
© inge GmbH
c
Insert a inge
®
interconnector into the 3
rd
module
4
4
th
dizzer
®
L 40 PB
a)
Note 4
th
dizzer
®
L 40 PB serial number to the loading
logbook
b)
Put the 4
th
module on the interconnector of the 3
rd
module
and push the package carefully into the pressure vessel
5
End-caps
a)
Re-install end-connectors following instructions of the
pressure vessel manufacturer or those specified in the
Operation Manual of the plant.
b)
Shims have to be inserted on the end-cap-
interconnector(s) on both sides
– as needed – in order to
compensate any length differences and prevent module
movement during operation.