![Inge dizzer L 40 PB Скачать руководство пользователя страница 31](http://html1.mh-extra.com/html/inge/dizzer-l-40-pb/dizzer-l-40-pb_assembly-instructions-manual_2058530031.webp)
Loading / Assembly
dizzer
®
L Series horizontal
– Assembly Instructions 2.2(2019-06) E inge
Page 31 of 60
© inge GmbH
5.2
General Specifications
5.2.1
Calculation of Personnel Requirements
Personnel Requirements for Mounting a Module without a Crane
CAUTION
DANGER OF INJURY!
Danger of injury due to physical strain.
Determine the weight of the module in use!
Always note the locally applicable maximum permissible load of
persons!
Note the specified number of persons required!
To mount the module without a crane, calculate the number of persons required as follows.
1. Determine the transport weight of a module you are using from the
3.1.3 Technical Data [dizzer
®
L 40 PB module] / 3.2.3 Technical Data [dizzer
®
L 55 module]
→
2. Determine the maximum permissible load on a person from the locally applicable laws and safety
regulations.
3. Calculate the required number of persons required to lift a module by dividing the module transport
weight by the maximum permissible load per person.
Always use the calculated number of persons when a module needs to be lifted.
For proper installation of the modules of the dizzer
®
L Series in pressure vessels at least 2 people are
required.
Personnel Requirements for Other Tasks
Unless otherwise specified, all other tasks require one person.