![Inge dizzer L 40 PB Скачать руководство пользователя страница 36](http://html1.mh-extra.com/html/inge/dizzer-l-40-pb/dizzer-l-40-pb_assembly-instructions-manual_2058530036.webp)
Loading / Assembly
dizzer
®
L Series horizontal
– Assembly Instructions 2.2(2019-06) E inge
Page 36 of 60
© inge GmbH
5.4.3
Checking the Delivery for Completeness
Step
Activity
Figure
1
Check the completeness of the delivery against the packing
list.
All packages on the packing list must be present.
2
Note the position of the module within the rack (line,
train/unit, side, position) together with the module serial
number.
3
Promptly inform your contact at inge GmbH if the number of
pieces differs between the packing list and the existing
packages.
5.4.4
Unpacking the Parts
NOTE
CAUTION, PROPERTY DAMAGE!
In case of abrupt temperature changes.
Store the modules for at least two days at temperatures above
freezing before opening the packaging carton.
Remove the packaging and labeling