![Inge dizzer L 40 PB Скачать руководство пользователя страница 34](http://html1.mh-extra.com/html/inge/dizzer-l-40-pb/dizzer-l-40-pb_assembly-instructions-manual_2058530034.webp)
Loading / Assembly
dizzer
®
L Series horizontal
– Assembly Instructions 2.2(2019-06) E inge
Page 34 of 60
© inge GmbH
5.3.2
Protecting the Work Area
Structure of the Work Area
The work area consists of the following areas:
The single parts of the dizzer
®
L modules that are in storage, have been unpacked, are being
tested and/or are being processed
The currently processed dizzer
®
L modules
The final location of the dizzer
®
L modules
and additionally on all routes:
All required access routes to the areas specified above
All required walking and driving distance between the areas specified above
All escape routes from one of the area or routes specified above
Protecting the Work Area
Protect the defined work area against access by persons who are not involved in the procedures
for installing the dizzer
®
L Modules
Protect the defined work area against all machines or devices that are not required for the
procedures for installing the dizzer
®
L modules
CAUTION
DANGER OF INJURY!
Danger of injury to bystanders, machines and devices in the work
area.
Protect the work area against unauthorized access and against
machines and devices that are not involved!