4.2.1.5. Output Connection
Please add four-pole (4-pole) circuit breaker (equivalent to UPS output breaker) to distribution panel where
the loads are to be connected. Connect the phase cable to
Output
L1-L2-L3
terminal and the neutral cable to
Output
N
terminal. Neutral connection should be done directly.
Read the
PDSP PREMIUM
Service Manual
carefully for External Battery connection!
Danger of explosion and fire if the batteries of the wrong type are used.
The batteries must be charged min. 10 hours before first-use.
Battery fast fuses shall only be replaced with fuses of the same type and rating.
To enable the short circuit protection feature of the UPS, each load shall be supplied through
a separate circuit breaker chosen according to the load current. This may provide quick
disconnection of the short circuited load and maintain operation continuity of the other
loads. To obtain maximum protection, the rating of each individual load circuit breaker shall
have the minimum value, which is enough to carry the full load current continuously.
Make sure that all circuit breakers are at
“0”
position before starting with the installation.
Each load should be supplied through separate circuit breaker and the cable cross section
should be chosen according to the load current value.
Make sure that the UPS is not overloaded to provide a higher quality supply to the loads.
Содержание PYRAMID DSP PREMIUM Series
Страница 15: ...9 10 15 20 30kVA Terminal Connections Separate Bypass Terminal Bypass L1 L2 L3 N version is optional...
Страница 16: ...10 40 60kVA Terminal Connections Separate Bypass Terminal Bypass L1 L2 L3 N version is optional...
Страница 17: ...11 80kVA Terminal Connections Separate Bypass Terminal Bypass L1 L2 L3 N version is optional...
Страница 18: ...12 100 120kVA Terminal Connections Separate Bypass Terminal Bypass L1 L2 L3 N version is optional...
Страница 19: ...13 160kVA Terminal Connections Separate Bypass Terminal Bypass L1 L2 L3 N version is optional...
Страница 20: ...14 200 250 300kVA Terminal Connections Separate Bypass Terminal Bypass L1 L2 L3 N version is optional...
Страница 65: ...59 The manufacturer reserves the rights to change the technical specifications and design without notice...