IV
INDEX
1. WARRANTY ......................................................................................................................................... 1
1.1. Terms of Warranty ...................................................................................................................... 1
1.2. Out of Warranty Terms and Conditions ...................................................................................... 1
2. SAFETY ................................................................................................................................................ 2
2.1. Important Notice for UPS ............................................................................................................ 2
2.2. Important Notice for Battery ...................................................................................................... 3
2.3. Description of the Symbols Used on the Labels Applied to the UPS .......................................... 3
3. REQUIREMENT ................................................................................................................................... 4
3.1. Transportation ............................................................................................................................. 4
3.2. Placement .................................................................................................................................... 4
3.3. Storage ........................................................................................................................................ 5
3.4. Electrical Requisites ..................................................................................................................... 5
4. UNPACKING AND INSTALLATION OF UPS .......................................................................................... 7
4.1. Unpacking and Moving ................................................................................................................ 7
4.2. Installation Procedures ............................................................................................................... 8
4.2.1. Power Connections ............................................................................................................... 8
4.2.2 Communiation Interface Connection .................................................................................. 18
5. MODES OF OPERATION .................................................................................................................... 23
5.1. Bypass Operation ...................................................................................................................... 25
5.2. Normal Operation ..................................................................................................................... 26
5.3. Battery Operation ..................................................................................................................... 27
5.4. Manual Bypass Operation ......................................................................................................... 28
6. FRONT PANEL ................................................................................................................................... 29
6.1. Front Panel ................................................................................................................................ 29
6.1.1. Keypad .................................................................................................................................... 29
6.1.2. Mimic Panel ........................................................................................................................ 30
6.1.3. Liquid Crystal Display (LCD) and User Menu ...................................................................... 31
6.2. Buzzer ........................................................................................................................................ 35
7. OPERATING PROCEDURES ............................................................................................................... 36
7.1. Preparations .............................................................................................................................. 36
7.2. Commissioning .......................................................................................................................... 37
7.2.1. Start-Up UPS with Internal Battery .................................................................................... 37
7.2.2. Start-Up UPS with External Battery .................................................................................... 38
Содержание PDSP 33010
Страница 17: ...12 80kVA Terminal Connections Separate Bypass Terminal Bypass L1 L2 L3 N version is optional...
Страница 18: ...13 100kVA Terminal Connections Separate Bypass Terminal Bypass L1 L2 L3 N version is optional...
Страница 19: ...14 120kVA Terminal Connections Separate Bypass Terminal Bypass L1 L2 L3 N version is optional...