7
4. UNPACKING AND INSTALLATION OF UPS
Check if the following are provided with the equipment
UPS
User Manual
Test Report
Key of the cabin door
Battery fuses (three pieces) ( @ some powers )
4.1. Unpacking and Moving
The procedure is as following:
Remove the bands and the protective packaging from the UPS.
Use suitable equipment to remove the UPS from the pallet.
Mount the cabinet parts supplied with the UPS after positioning and
connecting the UPS.
Equipment and batteries whose packages are damaged during transportation shall be
inspected by qualified Technical Personnel before starting the installation.
If any equipment has been damaged during shipment, keep the shipping and packing
material for the carrier or place of purchase and file a claim for shipping damage. If you
discover damage after acceptance, file a claim for concealed damage.
Before the installation, please check if your UPS is customized following your special
requirements (if any).
It is recommended to store the original UPS packaging for future needs.
Содержание PDSP 33010
Страница 17: ...12 80kVA Terminal Connections Separate Bypass Terminal Bypass L1 L2 L3 N version is optional...
Страница 18: ...13 100kVA Terminal Connections Separate Bypass Terminal Bypass L1 L2 L3 N version is optional...
Страница 19: ...14 120kVA Terminal Connections Separate Bypass Terminal Bypass L1 L2 L3 N version is optional...