ETR EVO UPS User Manual (Ver. 1.0)
Page 10
4.2. Installation Procedures
4.2.1. Power Connections
The power screw terminals are located on the lower front side of the UPS. Terminal details are shown
separately in the below figures. Refer to the names of each terminal to identify it during connection:
After the terminal front cover is removed, the cables shall be passed through the hole under the
connection terminals.
The equipment may only be installed and commissioned by authorized Technical
Personnel.
When the UPS is brought from a cold place to a warmer place, humidity of the air
may
condensate in it. In this case, wait for 2 (two) hours before beginning with the
installation.
Devices with internal batteries may have dangerous voltages on the battery
terminals.
Make sure that all circuit breakers are “OFF” before starting with the installation.
Содержание ETR EVO Series
Страница 16: ...ETR EVO UPS User Manual Ver 1 0 Page 11 10 15kVA 3Ph Input 3Ph Output Terminal Connections...
Страница 17: ...ETR EVO UPS User Manual Ver 1 0 Page 12 20 30kVA 3Ph Input 3Ph Output Terminal Connections...
Страница 18: ...ETR EVO UPS User Manual Ver 1 0 Page 13 40 60kVA 3Ph Input 3Ph Output Terminal Connections...
Страница 19: ...ETR EVO UPS User Manual Ver 1 0 Page 14 80kVA 3Ph Input 3Ph Output Terminal Connections...
Страница 20: ...ETR EVO UPS User Manual Ver 1 0 Page 15 100kVA 3Ph Input 3Ph Output Terminal Connections...
Страница 21: ...ETR EVO UPS User Manual Ver 1 0 Page 16 120kVA 3Ph Input 3Ph Output Terminal Connections...
Страница 22: ...ETR EVO UPS User Manual Ver 1 0 Page 17 160kVA 3Ph Input 3Ph Output Terminal Connections...
Страница 23: ...ETR EVO UPS User Manual Ver 1 0 Page 18 200kVA 3Ph Input 3Ph Output Terminal Connections...
Страница 36: ...ETR EVO UPS User Manual Ver 1 0 Page 31...
Страница 71: ...ETR EVO UPS User Manual Ver 1 0 Page 66 40 200kVA Standard UPS 40 200kVA UPS with Split Bypass...