P a g e
| 39
LT 7602 Issue No2 (07/17)
480 HD INSTALLATION INSTRUCTIONS
The battery manual override option is a backup supply in case of a power failure / power cut
to the property. The battery holder and adaptor lead are provide within the packing of the
appliance. (Please note that the “C” cell batteries are not included). It is good practice to
demonstrate the battery option to the customer during the commissioning process.
Fire Box Installation
Note: - When installing the appliance with a 3 inch (75mm) rebated surround the optional
30mm spacer frame Part No 7569 will be required.
The fire box assembly can be retained using the following two methods.
Secure the firebox when fitted with 50mm rebated surround
Using suitable rawl plugs and wood screws retain the fire box using the four 6mm holes within
the firebox flange. With the fire box secured, slide the fireplace frame assembly over the four
4mm studs projecting forward from the fire box flange. Fix the frame to the fire box using the
M4 nuts and the nut spinner provided within the appliance packaging. (Please see figure 6)
Содержание 480HD
Страница 14: ...P a g e 13 LT 7602 Issue No2 07 17 480 HD USERS INSTRUCTIONS...
Страница 17: ...P a g e 16 LT 7602 Issue No2 07 17 480 HD USERS INSTRUCTIONS...
Страница 21: ...P a g e 20 LT 7602 Issue No2 07 17 480 HD USERS INSTRUCTIONS...
Страница 25: ...P a g e 24 LT 7602 Issue No2 07 17 480 HD USERS INSTRUCTIONS...
Страница 52: ...P a g e 51 LT 7602 Issue No2 07 17 480 HD SERVICE FAULT FINDING INSTRUCTIONS Fault Finding Charts...
Страница 53: ...P a g e 52 LT 7602 Issue No2 07 17 480 HD SERVICE FAULT FINDING INSTRUCTIONS...
Страница 54: ...P a g e 53 LT 7602 Issue No2 07 17 480 HD SERVICE FAULT FINDING INSTRUCTIONS...
Страница 55: ...P a g e 54 LT 7602 Issue No2 07 17 480 HD MAINTENANCE INSTRUCTIONS Wiring Diagram Attach to oxy pilot...