6 - 10
IP
N 07
4-
51
1-
P1
C
SQM-160 Operating Manual
6.3.2 Cool Drawer
Follow the procedure below to replace the crystal in a Next Generation Cool
Drawer™ sensor:
1
Using your thumb and index fingers, gently squeeze the sides of the retainer at
the mid section then lift it up, away from the drawer, as shown in
2
Hold the drawer by the handle and turn it upside down to remove the spent
crystal.
3
Install a new crystal in the drawer. Observe its orientation. The pattern
electrode should face upward as shown in
4
Hold the retainer by its sides. Align its orientation notch with the drawer then
gently and evenly push the retainer down until it snaps firmly into the drawer.
see
. Never push down (or pull up) on the contact spring, doing so
may permanently damage it.
5
Inspect the whole assembly. The retainer should be even and engage the
drawer at all four corners.
Figure 6-2 Cool Drawer - Removing The Crystal
Contact Spring
Содержание SQM-160
Страница 1: ...O P E R A T I N G M A N U A L SQM 1 60 Multi Film Rate Thickness Monitor IPN 074 511 P1C ...
Страница 2: ......
Страница 5: ......
Страница 6: ......
Страница 8: ......
Страница 22: ...1 10 IPN 074 511 P1C SQM 160 Operating Manual This page is intentionally blank ...
Страница 30: ...2 8 IPN 074 511 P1C SQM 160 Operating Manual This page is intentionally blank ...
Страница 60: ...4 12 IPN 074 511 P1C SQM 160 Operating Manual This page is intentionally blank ...
Страница 76: ...5 16 IPN 074 511 P1C SQM 160 Operating Manual This page is intentionally blank ...
Страница 98: ...6 22 IPN 074 511 P1C SQM 160 Operating Manual This page is intentionally blank ...
Страница 110: ...8 8 IPN 074 511 P1C SQM 160 Operating Manual This page is intentionally blank ...
Страница 120: ...A 10 IPN 074 511 P1C SQM 160 Operating Manual This page is intentionally blank ...