tina83e1-d (2018-12)
41
If the pressure value 1000 mbar is output at the
measurement value output, the adjustment has been
successful. Otherwise, repeat the adjustment proce-
dure.
Evacuate the vacuum system to p < 10
-5
mbar and wait at
least 2 minutes.
Press the <ADJ> button with a pin and the HV adjustment
is carried out (duration
≈
5 s).
If the pressure value 1×10
-5
mbar is output at the
measurement value output, the adjustment has been
successful. Otherwise, repeat the adjustment proce-
dure.
6.2
Cleaning the Gauge / Replacing Parts
In case of severe contamination or defective (e.g. pirani
filament rupture (MPG5xx)), replace the complete
measuring chamber (Spare Parts
→
DANGER
Contaminated parts
Contaminated parts can be detrimental to health
and environment.
Before beginning to work, find out whether any
parts are contaminated. Adhere to the relevant re-
gulations and take the necessary precautions when
handling contaminated parts.
Содержание Gemini MAG500
Страница 63: ...tina83e1 d 2018 12 63 Notes ...