Inspection Procedures
Periodic inspection and servicing of the units is required to maintain optimum
operation
We recommend the following schedule:-
Assuming the unit has been installed and tested by a suitably qualified gas/ electrical
engineer.
1
st
service
(post installation check up) after 50 hours of operation
Regular service/ inspection
1000 hours or annually, whichever is the sooner.
Service / Inspection procedures should include…..
1. Check for leaks in all pipe-work and gas supply
2. Check for leak tightness of the unit ensuring all waste gas travels up the
chimney output
3. All safety shut off valves and safety guards should be inspected.
4. A temperature and combustion analysis should be performed to ensure that
there is no deterioration of incinerator performance.
5. Timers should be calibrated to ensure that they reflect a true reading and
ensure that the safety cut off applies.