Specifications Summary

  All installations must be in accordance with state and local codes.

WASTE CHAMBER

Chamber capacity  
(Type IV waste - animals) 

200 kg 

Chamber volume 

.36 m

3

Width 91 

cm 

Height 86 

cm 

Chamber size 
(outside) 
(less burner and 
counter weights)  Length 122 

cm 

Door opening 

56 x 74 cm 

Height to door 

77 cm 

Height to top of stack 

3.3 m 

Suggested slab size  
(L x W x Thickness) 

1.8 m x 2.4 m x 10 cm 

STACK

30 cm diameter 16 gauge (1.52 mm) stainless steel 

 

BURNERS

LP or natural gas burner.  
Oil burner  

Operation

Single burner or Two stage burn with timer (Defra models only) 

Standard - 115 volt, 60 HZ, 20 amp 

ELECTRICAL SERVICE

Also available - 220 volt, 50 HZ, 10 amp 

LP 

3.0 GPH 

11.4 l/hr 

Natural 

275 CFH 

7.8 m

3

/hr 

FUEL 
CONSUMPTION

Fuel Oil 

3.0 GPH 

13.2 l/hr 

 Secondary Chamber (DEFRA Approved models only) 

Chamber size (outside)

 

Width 43cm 

Height 200cm 

Length 66cm 

Chamber Volume

 

 .44 cubic meters 

We reserve the right to alter specifications without prior notice

 
Installation

 

Must be installed in accordance with local codes and ordinances, subject to regulatory 
agencies. Stack test data is available from the distributor for permit application. If on-site 
testing is required, it is the responsibility of the purchaser and can be arranged through the 
distributor. Outside installation is recommended with a simple metal roof or three-sided 
metal shelter, providing a minimum four foot clearance from any combustible material. 
Inside installations may have special insurance requirements. Factory must be advised.

 

 
 
 
 

 

4

Содержание A400-G

Страница 1: ...r Model A400 G Operators Manual Important Failure to cure refractory Before using will void warranty see refractory curing procedure Tampering with orifices in the burner will void warranty Revised January 2005 1 ...

Страница 2: ...ifications Page 4 Service installation sheet Page 5 Site plan fitting Page 6 Assembly Instructions Page 7 Commissioning start up procedures Page 8 Operator instructions Page 8 Refractory Curing Procedure Page 9 Inspection Servicing Page 10 Fitting Chimney through roof dia Page 11 Warranty Page 12 ...

Страница 3: ...n to composting Studies found costs of incineration to be very favourable against other methods of disposal SANITARY Waste can be destroyed as fast as it accumulates Nothing is left to spread disease or to attract rodents and flies CONVENIENT Fill the chamber and turn on the burner No watching required since timer automatically shuts down burner Alternative methods frequently require more time to ...

Страница 4: ...HZ 10 amp LP 3 0 GPH 11 4 l hr Natural 275 CFH 7 8 m3 hr FUEL CONSUMPTION Fuel Oil 3 0 GPH 13 2 l hr Secondary Chamber DEFRA Approved models only Chamber size outside Width 43cm Height 200cm Length 66cm Chamber Volume 44 cubic meters We reserve the right to alter specifications without prior notice Installation Must be installed in accordance with local codes and ordinances subject to regulatory a...

Страница 5: ...5 Inciner8 Incinerator Model A400 Installation Location Installed by Date Sold By Service Record Date Comments ...

Страница 6: ...n and inspection Electrical Service 220 Volt 50 60 HZ 10 Amp 1 Electrical service can be supplied by plugging into the cordset NOTE Polarity must be maintained or the burners will not operate If burners lock out after approximately 5 seconds and the blower continues to operate then the polarity is incorrect It should be corrected at the power source not in the incinerator control Fuel Install gas ...

Страница 7: ...nuts 3 Position the stack screen over the top of the stack and attach with the 3 x screws Primary Chamber 1 Bolt the door latch to the primary chamber with 4 x 3 8 16 x 1 bolts and nuts 2 Bolt the counter weight to the counter weight arm with 2 x 5 16 18 x 7 1 2 bolt and nuts IT IS VERY IMPORTANT THAT THE DOOR IS NICELY BALANCED AND MAKES A FIRM SEAL AROUND THE WHOLE CASE WHEN CLOSED SHUT FAILURE ...

Страница 8: ...ty 5 Once the temperature reaches in excess of 850 deg C displayed on the temperature readout select the Off setting on the switch 6 NOW LOAD THE INCINERATOR Keep the waste 20cm away from the burner port 7 Lock the unit door to ensure that no one can inadvertently access the chamber during the burn 8 START BURNER by setting the switch to incinerate for the desired burn time A full load will normal...

Страница 9: ...utes Burn 15 minutes Cool 15 minutes Burn 30 minutes Cool 15 minutes Burn 30 minutes Cool 15 minutes Burn 1 hour Cool 15 minutes Burn 1 hour Cool 15 minutes Burn 2 hours Cool 15 minutes Burn 3 hours Total Time 12 hours There will be hairline cracks and minor scaling of the refractory when curing is completed This is a normal result of the curing process ...

Страница 10: ...000 hours or annually whichever is the sooner Service Inspection procedures should include 1 Check for leaks in all pipe work and gas supply 2 Check for leak tightness of the unit ensuring all waste gas travels up the chimney output 3 All safety shut off valves and safety guards should be inspected 4 A temperature and combustion analysis should be performed to ensure that there is no deterioration...

Страница 11: ...11 ...

Страница 12: ...ty for returning merchandise pursuant to this warranty with reasons for the request Limitations Products which are abused or neglected are not covered under this warranty including overfilling units or covering burner outlets please refer to manual for usage instructions Warrantor shall not be responsible for the costs of removal or reinstallation of its products and shall not be liable for transp...

Отзывы: