STEP-10 (See Diagram 10)
A.) Attach the Leg Developer (#7) to the Leg Developer Holder (#2). Secure it with one M10 x
3 1/8” Allen Bolt (#90), two
∅
¾” Washers (#82), and one M10 Aircraft Nut (#99). Do not
over tighten the nut and bolt. Make sure the Leg Developer is able to swivel.
B.) Insert three Foam Tubes (#15) halfway through the holes on the Leg Developer Holder and
Leg Developer. Push six Foam Rolls (#53) onto the Tubes. Plug six Foam Roll End Caps
(#55) into the Tubes.
C.) Attach an Olympic Sleeve (#59) onto the weight post on the Leg Developer. Attach a
Spring Clip (#76) to the Sleeve.
D.) Attach a Curl Bar Holder Frame (#108) to the Leg Developer. Secure it with a L-shaped
Pin (#107).
DIAGRAM 10
21
Содержание MARCY MXM-5
Страница 5: ...HARDEWARE PACK 4 ...
Страница 6: ...HARDEWARE PACK 5 ...
Страница 7: ...HARDEWARE PACK 6 ...
Страница 8: ...HARDEWARE PACK 7 ...
Страница 10: ...DIAGRAM 1 9 ...
Страница 12: ...DIAGRAM2 11 ...
Страница 15: ...CABLE LOOP DIAGRAM 14 ...
Страница 17: ...DIAGRAM 5 16 ...
Страница 24: ...SMITH MACHINE EXPLODED DIAGRAM 23 ...
Страница 25: ...24 ...