22
20
1
2
3
4
5
6
7
C
33
21
1
4
7
9
5
5
6
7
8
3
2
S
A
C
53
*
- C
8
3
22
C
33
22
INS
TALLER
US
ER
MAINTEN
AN
CE TECHNI
CI
AN
Max. 45
%
Max. 32000 mm
The kit includes:
N° 1 - Exhaust gasket (1)
N° 1 - Flange gasket (2)
N° 1 - Female intake flange (3)
N° 1 - Female exhaust flange (4)
N° 2 - Bend 90° Ø 80 (5)
N° 1 - Intake terminal Ø 80 (6)
N° 2 - Internal wall sealing plates (7)
N° 1 - External wall sealing plate (8)
N° 1 - Exhaust pipe Ø 80 (9)
*
to complete C
53
configuration, also provide for a “green
range” roof discharge terminal.
The configuration on walls opposite the building is not allowed.
The adaptor kit includes:
N° 1 - Gasket (1)
N° 1 - Adapter
Ø 80/125 (2)
The Kit Ø 80/125 includes:
N° 1 - Wall sealing plate (3)
N° 1 - Aluminium tile (4)
N° 1 - Fixed half-shell (5)
N° 1 - Mobile half-shell (6)
N° 1 - Concentric intake-exhaust terminal Ø 80/125 (7)
The remaining kit components must not be used
•
Extensions for vertical kit
Ø
8
0/125
(
Fig. 21
)
.
Th
e kit with this configuration can be extended up to a max.
length of 32 m including the terminal. If additional components
are assembled, the length equivalent to the maximum allowed
must be subtracted. In this case specific extensions must be
requested.
1.1
6
SEPARATOR KIT INSTALLATION.
Type C configuration, sealed chamber and fan assisted.
•
Separator kit
Ø
8
0/
8
0.
Th
is kit allows air to come in from outside the building and the
exhaust to exit from the chimney,
fl
ue or intubated duct through
divided
fl
ue exhaust and air intake pipes. Combustion products
are expelled from pipe (S) (in plastic, so as to resist acid con-
densate). Air is taken in through duct (A) for combustion (this
is also in plastic).
Th
e intake pipe (A) can be installed either on
the right or left hand side of the central exhaust pipe (S). Both
ducts can be routed in any direction.
•
Kit assembly
(
Fig. 22
)
:
install
fl
ange (4) on the central hole of the boiler, positioning
gasket (1) with the circular projections downwards in contact
with the boiler
fl
ange, and tighten using the hex screws with
fl
at tip contained in the kit. Remove the
fl
at
fl
ange present in
the lateral hole with respect to the central one (according to
needs) and replace it with the
fl
ange (3), positioning the gasket
(2) already present in the boiler and tighten using the supplied
self-threading screws. Fit the male side (smooth) to the bends (5)
in the female side of the
fl
anges (3 and 4). Fit the intake terminal
(6) with the male side (smooth) in the female side of the bend
(5) up to the end stop, ensuring that the internal and external
wall sealing plates are fitted. Fit the exhaust pipe (9) with the
male end (smooth) to the female end of the bend (5) up to the
Vertical kit with aluminium tile
Ø
8
0/125.
Kit assembly
(
Fig. 20
)
:
to install the kit
Ø
80/125 one must use the
fl
anged adapter kit
in order to install the
fl
ue system
Ø
80/125. Install the
fl
anged
adaptor (2) on the central hole of the boiler, positioning gasket
(1) with the circular projections downwards in contact with the
boiler
fl
ange, and tighten using the screws contained in the kit.
Installation of the fake aluminium tile: replace the tiles with the
aluminium sheet (4), shaping it to ensure that rainwater runs off.
Position the fixed half-shell (5) on the aluminium tile and insert
the intake-exhaust pipe (7). Fit the
Ø
80/125 concentric terminal
pipe with the male side (smooth) to the female side of the adapter
(1) (with lip gaskets) up to the end stop; making sure that the wall
sealing plate (3) has been fitted, this will ensure sealing and joining
of the elements making up the kit.
Содержание Victrix Zeus 25
Страница 1: ...VICTRIX ZEUS 25 Instructions and recommendations Installer User Maintenance technician IE 1 042022ENG...
Страница 2: ......
Страница 66: ...66 66...
Страница 67: ...67 67...