1.17 FLUES, CHIMNEYS, CHIMNEY CAPS 

AND TERMINALS.

The flues, chimneys and chimney caps for the 

evacuation of combustion products must be in 

compliance with standards in force. The chimney 

caps and the roof exhaust terminals must respect 

the outlet quotas and the distance of the foreseen 

technical volumes from the current technical 

regulations.

Positioning the wall exhaust terminals.

 The 

exhaust terminals must:
- be installed on external perimeter walls of the 

building;

- be  positioned  according  to  the  minimum 

distances  specified  in  current  technical 

standards.

Combustion products exhaust of natural or 

fan assisted appliances in open-top closed 

environments.

  In  spaces  closed  on  all  sides 

with  open  tops  (ventilation  pits,  air  shafts, 

courtyards etc.), direct flue exhaust is allowed 

for  conventional  or  fan  assisted  draught  gas 

appliances with a heating power range from 4 to 

35 kW, provided the conditions as per the current 

technical standards are respected.

1.18 SYSTEM FILLING.

Once  the  boiler  is  connected,  proceed  with 

system filling via the filling valve (Fig. 1-29 and 

2-8). Filling is performed at low speed to ensure 

release of air bubbles in the water via the boiler 

and heating system vents.

The boiler has a built-in automatic venting valve 

on the circulator. 

Check if the cap is loose.

 Open the 

radiator air vent valves.

Close  radiator  vent  valves  when  only  water 

escapes from them.

Close the filling valve when the boiler manometer 

indicates approx. 1.2 bar. 

N.B.:

  during  these  operations  start/up  the 

circulation pump at intervals, acting on the main 

switch positioned on the control panel. 

Vent the 

circulation pump by loosening the front cap and 

keeping the motor running.

 Re-tighten the cap 

after the operation.

1.19 FILLING THE CONDENSATE TRAP.

On  first  lighting  of  the  boiler  combustion 

products may come out the condensate drain; 

after a few minutes’ operation check that this no 

longer occurs. This means that the trap is filled 

with condensate to the correct level preventing 

the passage of combustion products.

1.20 GAS SYSTEM START-UP.

To  start  up  the  system,  refer  to  the  current 

regulations.  This  divides  the  systems  and 

therefore  the  start-up  operations  into  three 

categories: new systems, modified systems, re-

activated systems.

In particular, for new gas systems:

- open windows and doors;
- avoid presence of sparks or naked flames;
- bleed all air from pipelines;
- check that the internal system is properly sealed 

according to specifications.

1.21 BOILER START UP (IGNITION).

For  issue  of  the  Declaration  of  Conformity 

provided for by Italian Law, the following must 

be performed for boiler start-up:

- check that the internal system is properly sealed 

according to specifications;

- ensure that the type of gas used corresponds to 

boiler settings;

- switch the boiler on and ensure correct ignition;
- make sure that the gas flow rate and relevant 

pressure values comply with those given in the 

manual ( Par. 3.18);

- ensure that the safety device is engaged in the 

event of gas supply failure and check activation 

time;

- check activation of the main switch located 

upstream from the boiler and in the boiler;

- check  that  the  concentric  intake-exhaust 

terminal (if fitted) is not blocked.

The boiler must not be started up even if only 

one of the checks should be negative.

N.B.:

 the boiler preliminary check must be carried 

out by a qualified technician. The boiler warranty 

is valid as of the date of testing.

The test certificate and warranty is issued to the 

user.

Содержание VICTRIX Superior TOP 32 E

Страница 1: ...VICTRIX Superior TOP 32 E IE Instruction and warning book 1 032471IE...

Страница 2: ...DECLARES THAT the Immergas boiler model Victrix Superior TOP 32 E is in compliance with the same European Community Directives Mauro Guareschi Research Development Director Signature Dear Client Our c...

Страница 3: ...r any damage caused to the household appliances It is also advisable to not position furnishings furniture etc under the boiler for the above mentioned reasons In the event of malfunctions faults or i...

Страница 4: ...The instructions of the manufacturer of this liquid must be followed scrupulously regarding the percentage necessary with respect to the minimum temperature at which the system must be kept An aqueous...

Страница 5: ...lime scale apparatus is preserved for example limescale deposits from the slurry formation and other noxious deposits Waterconnectionsmustbemadeinarationalway using the couplings on the boiler templa...

Страница 6: ...the Super CAR must be used with its climate thermostat function disabled i e it must be set to On Off mode CARV2 Super CAR or On Off chrono thermostat electrical connection Optional The operations des...

Страница 7: ...This information allows calculations to be made to verify the possibility of setting up various flue configurations Positioning of the gaskets black for green range flue extraction systems Position t...

Страница 8: ...Intake and Exhaust 16 3 m 2 5 Intake m 18 7 Exhaust m 4 9 m 7 7 Exhaust m 13 6 Concentric vertical intake exhaust terminal 60 100 Intake and Exhaust 9 m 1 4 Intake m 10 3 Exhaust m 2 7 m 4 3 Exhaust...

Страница 9: ...laps Fit the male side smooth of the exhaust terminal into the the female side of the bend 90 80 making sure that the relevant wall sealing plate is already fitted this will ensure the hold and joinin...

Страница 10: ...ested Horizontal intake exhaust kit 80 125 Kit assembly Fig 1 15 for the installation of kit 80 125 the flanged adapter kit must be used to be able to install the flue system 80 125 Install the flange...

Страница 11: ...take exhaust pipe 5 Fit the 60 100 3 concentric terminal pipe with the male end 5 smooth into the flange 2 up to the stop making sure that the wall sealing plate has been fitted 3 this will ensure sea...

Страница 12: ...flat flange present in the lateral hole with respect to the central one according to needs and replace it with the flange 3 positioning the gasket 2 already present in the boiler and tighten using th...

Страница 13: ...he removal of possible condensate forming in the exhaust pipe tilt the pipes towards the boiler with a min slope of 1 5 Assemble the lid A complete with adapter 1 and wall plugs 6 and assemble the flu...

Страница 14: ...ue technical slot The max possible length of the 60 flexible ducting vertical section is equal to 30 m This length is obtained considering the complete 80 exhaust terminal 1m of 80 pipe in exhaust two...

Страница 15: ...ent the circulation pump by loosening the front cap and keeping the motor running Re tighten the cap after the operation 1 19 FILLING THE CONDENSATE TRAP On first lighting of the boiler combustion pro...

Страница 16: ...the power supplied by the burner greater the power greater the speed Moreover inside the parameter it is possible to regulate the operation range of the pump by setting the maximum speed adjustable fr...

Страница 17: ...ly This kit is very useful for maintenance because it allows to empty just the boiler without having to empty the entire system Moreover the version with filter preserves the functioning characteristi...

Страница 18: ...e of electrical power requires some fundamental rules to be observed do not touch the appliance with wet or moist parts of the body do not touch when barefoot never pull electrical cables or leave the...

Страница 19: ...tral heating in order to evacuate residual flue gases F5 Postcirculation in progress Pump in function after a request for domestic hot water or central heating in order to cool the primary circuit P33...

Страница 20: ...By turning the selector switch 1 in a clockwise direction the temperature increases and in an anti clockwise direction it decreases During the heating of the domestic hot water DHW ON appears on the...

Страница 21: ...chnician must be called e g Immergas After Sales Service Maximum No of resets Available number of resets already made Insufficient system pressure Water pressure inside the central heating system that...

Страница 22: ...in the case of malfunctioning or anomaly the display of the temperature is replaced by the relative error code present in the table Par 2 6 2 7 BOILER SHUTDOWN Switchtheboileroffbypressingthe button d...

Страница 23: ...The display is always lit up OFF The display only lights up when the controls are accessed and remains on for 5 seconds after the last operation performed P32 D C P32 B D C ITALIANO D x select C All d...

Страница 24: ...t by the external probe See OFFSET on the external probe graphics Fig 1 8 by modifying the temperature from 15 C to 15 C P94 D x select C It defines the flow temperature of the zone number 3 at low te...

Страница 25: ...or aeration of the installation room where provided If even only a single safety check offers a negative result do not commission the system 3 1 HYDRAULIC DIAGRAM Key 1 Condensate drain trap 2 Water i...

Страница 26: ...the system pressure is within established limits Check that the radiator valves are not closed and also the functionality of the pump Siphon blocked This may be caused by dirt or combustion products...

Страница 27: ...board air gas circuit components or in the case of installations with fume extraction systems with horizontal concentric pipe measuring more than 1 metre The boiler heat output is correlated to the le...

Страница 28: ...ive take the heating selector switch to maximum turn it in a clockwise direction until 99 is seen on the display To have an exact value of CO2 in the flue gases the technician must insert the sampling...

Страница 29: ...the maximum delivery temperature With the external probe present it defines the maximum flow temperature corresponding to functioning with minimum external temperature see graphics Fig 1 8 can be set...

Страница 30: ...juster on the various levels Auto automatic functioning therefore with variable flow rate Open adjuster completely open therefore maximum flow rate available 08 L M 10 L M and 12 L M ffunctioning with...

Страница 31: ...t upstream from the boiler Set the P 71 function on P 71 1 Par 3 8 When the boiler inlet water is at a temperature that is equal or greater with respect to that set by the domestic hot water selector...

Страница 32: ...with that indicated by the regulations in force 3 17 CASING REMOVAL To facilitate boiler maintenance the casing can be completely removed as follows disassemble the front 1 of the boiler by loosening...

Страница 33: ...kg h mbar mm H2 O kg h mbar mm H2 O 32 0 27520 3 45 8 30 84 6 2 58 8 40 85 7 2 53 8 20 83 6 31 0 26660 3 34 7 80 79 6 2 49 7 88 80 4 2 45 7 76 79 2 30 0 25800 3 23 7 33 74 7 2 41 7 39 75 3 2 37 7 34...

Страница 34: ...ith burner On Off 80 60 C 0 48 0 30 Heat loss at flue with burner On Off 80 60 C 0 03 2 20 Central heating circuit max operating pressure bar 3 Central heating circuit max operating temperature C 90 A...

Страница 35: ......

Страница 36: ...immergas com Immergas S p A 42041 Brescello RE Italy T 39 0522 689011 F 39 0522 680617 This instruction booklet is made of ecological paper Code 1 032471IE rev 15 036945 001 09 2012...

Отзывы: