BOILER
INSTALLATION
1.1 INSTALLATION
RECOMMENDATIONS.
The Nike Mini 28 kW Special boiler has been
designed for wall mounted installation only,
for heating rooms and for the production of
domestic hot water, for domestic use and similar
purposes.
The wall surface must be smooth, without any
protrusions or recesses enabling access to the
rear part. They are not designed to be installed
on plinths or floors (Fig. 1-1).
Only professionally enabled heating/plumbing
technicians are authorised to install Immergas
gas appliances. Installation must be carried out
according to regulation standards, current legi-
slation and in compliance with local technical re-
gulations and the required technical procedures.
Attention:
the manufacturer declines all liability
for damages caused by boilers removed from
other systems or for any non-conformities of
such equipment.
Before installing the appliance, ensure that it
is delivered in perfect condition; if in doubt,
contact the supplier immediately. Packing
materials (staples, nails, plastic bags, polystyrene
foam, etc.) constitute a hazard and must be kept
out of the reach of children. If the appliance
is installed inside or between cabinets, ensure
sufficient space for normal servicing; therefore
it is advisable to leave clearance of at least 3
cm between the boiler casing and the vertical
sides of the cabinet. Leave adequate space above
the boiler for possible water and flue removal
connections. It is just as important that the intake
grids are not obstructed. Keep all flammable
objects away from the appliance (paper, rags,
plastic, polystyrene, etc.). Do not place household
appliances underneath the boiler as they could
be damaged if the safety valve intervenes (if not
conveyed away by a draining funnel), or if there
are leaks from the connections; on the contrary,
the manufacturer cannot be held responsible for
any damage caused to the household appliances.
In the event of malfunctions, faults or incorrect
operation, turn the appliance off immediately and
contact a qualified technician (e.g. the Technical
Assistance centre, which has specifically trained
staff and original spare parts) Do not attempt
to modify or repair the appliance alone. Failure
to comply with the above implies personal
responsibility and invalidates the warranty.
• Installation regulations:
- these boilers cannot be installed in bedrooms,
studio flats and bathrooms. They also cannot
be installed in rooms with wood (or solid
fuel) burning heat generators and in adjacent
and communicating rooms.
- Installation in places with a fire risk is
prohibited (for example: garages, closed
parking stalls), gas appliances and relative flue
ducts, flue exhaust pipes and combustion air
intake pipes.
- Installation is prohibited on the vertical
projection of cooking hobs.
- Installation is also prohibited in places/
environments that constitute common parts
of office condominiums such as stairs, cellars,
entrance halls, attics, lofts, escape routes,
etc. if they are not located inside technical
compartments under the responsibility of
each individual building and only accessible
to the user (for the features of the technical
compartments, see the technical standards in
force).
- Type B open chamber boilers must not be
installed in places where commercial, artisan
or industrial activities take place, which use
products that may develop volatile vapours
or substances (e.g. acid vapours, glues, paints,
solvents, combustibles, etc.), as well as dusts
(e.g. dust deriving from the working of
wood, coal fines, cement, etc.), which may be
harmful for the components of the appliance
and jeopardise operation.
- They must also be installed in rooms where
the temperature cannot fall below 0°C and
must not be exposed to weathering.
Attention:
wall mounting of the boiler must
guarantee stable and efficient support for the
generator.
The plugs (standard supply) are to be used only in
conjunction with the mounting brackets or fixing
template to fix the appliance to the wall;
they only
ensure adequate support if inserted correctly
(according to technical standards) in walls made
of solid or semi-hollow brick or block. In the
case of walls made from hollow brick or block,
partitions with limited static properties, or in any
case walls other than those indicated, a static test
must be carried out to ensure adequate support.
N.B.: the hex head screws supplied in the blister
pack are to be used exclusively to fix the relative
mounting bracket to the wall.
These boilers are used to heat water to below
boiling temperature in atmospheric pressure.
They must be connected to a central heating
system and hot water circuit suited to their
performance and capacity.
They cannot be connected directly to low-
temperature systems.
Fig. 1-1
YES
NO
Содержание 3.018921
Страница 1: ...NIKE MINI 28 KW SPECIAL Instruction and warning booklet 1 040845ENG...
Страница 21: ......
Страница 22: ......
Страница 23: ......