50
de
fr
en
nl
General information
Installation and operating personnel must have the appropriate skills and training. These installation instructions, particularly
the safety instructions on page 71, must to be followed in all cases during installation and operation.
For your future reference, please enter the following system information:
TecBox No.
..........
TecBox Type
..........
Static height
HST .......... mWs
Max. system temperature
tmax .......... °C
Max. return temperature
tR .......... °C
Response pressure of safety valve
PSV .......... bar
at heat generator
Customer service
Head office:
IMI Hydronic Engineering AG
Phone +41 (0)61 906 26 26
Mühlerainstrasse 26
Fax +41 (0)61 906 26 27
CH - 4414 Füllinsdorf
Agencies:
www.imi-hydronic.com
Содержание Pleno PI 6.1
Страница 25: ...25 25 de fr en nl...
Страница 49: ...49 49 de fr en nl...
Страница 73: ...73 73 de fr en nl...
Страница 97: ...97 97 de fr en nl...
Страница 98: ...98...