Selenio™ Network Processor
User Guide
Installation
© 2019 Imagine Communications Corp.
Proprietary and Confidential.
May 2019 | Page 25
You can secure the cable relief bar through any of the screw holes on the arm.
Figure 6:
Attaching the Cable Relief Bar
4.
Push the SN
P into the front of the rack, and attach the frame’s front
-mounting ears to the rack using
the appropriate screws (not provided).
5.
Slide the two arms into their slots from the back of the frame and attach the arms to the back of the
rack.
Figure 7:
Installed Support Arms and Cable Relief Bar
6.
Make all necessary electrical and optical connections to the back of the frame.
CAUTION
Do not use slide/rail mounted equipment as a shelf or a work space.
Configuring a PTP Network
A PTP network will normally include a PTP source such as a Tektronix PTP generator. This, and the SNP
and switch (such as an Arista switch) need to be correctly configured.