Selenio™ Network Processor
User Guide
Servicing
© 2019 Imagine Communications Corp.
Proprietary and Confidential.
May 2019 | Page 144
Installing the Hot-Swappable Power Supply
With the SNP frame power supply access panel open, follow these steps:
1.
Slide the power supply into the empty space.
2.
Connect the power cord to the power supply.
You can do this step before completely locking the power supply into place, or after. It might be
easier to do it before.
Note:
When installing power supplies (especially if you have disconnected both power supplies) that
the cables are labeled. It is very important that the correct cable be attached to each power supply.
Power supply slot identification is etched into the metal of the frame on the front, and screened
onto the back of the frame. If you do not connect the correct cable to the correct power supply,
indicators in the SNP Manager will not provide correct power supply health information.
3.
Push the power supply the rest of the way into the device until the release latch snaps into place.