3UHSDULQJDQGSHUIRUPLQJPHDVXUHPHQWV
IKA
-WERKE C 2000 basic / control
Ver. 04 08.07
3DJH
A window appears at the beginning from which the correct measurement must be
selected.
If the
5H,QLW
option is active, a check of the cooling water will first be performed. The
remaining course of the measurement is now enabled if stable temperature equali-
zation of the outer vessel is ensured. Otherwise the measurement must be inter-
rupted.
After this the measuring cell cover closes. The decomposition vessel is filled with
oxygen (for about 60 sec.).
After the temperature in the outer vessel has stabilized (90 ... 120 sec.), the inner
vessel fills with water. As soon as the system starts the experiment, the display
shows the course of the temperature of the inner vessel over time as a graph.
H[DPLQDWLRQ
FRROLQJZDWHU
H[SHULPHQWOLVW
Artisan Technology Group - Quality Instrumentation ... Guaranteed | (888) 88-SOURCE | www.artisantg.com