background image

2

1. INSTALLATION

Installing STARRY SKY in concrete surfaces is a straightforward, yet time-consuming operation—as a function of the

number of points involved. To date, AFO has supplied thousands of similar systems for as many successful

installations in eighty countries.

2. POINT DENSITY

The number of points depends on subjective aesthetic appreciations. In our experience, the most successful and striking 

examples have had average densities of 4 to 8 points in each square meter.

3. DISTRIBUTION

A common mistake is to distribute points uniformly. Skies look much more realistic if the points are randomly placed, with 

some clustered areas and others with fewer or no points. For a more realistic effect, a perimeter of 200 to 300mm (8” to 

12”) should be left empty of points, except in pool designs involving lateral infinity mirrors.

4. ILLUMINATOR PLACEMENT

International safety regulations vary from country to country, but in general, 12VAC powered fixtures don’t have minimum-

distance to water restrictions. When possible, lluminators should be located close to the effect to shorten fiber runs and 

maximize system performance.

5. MAINTENANCE AND GUARANTEE

The polymers in the cladding of STARRY SKY’s fibers are halogen free, M1 fire-retardant, and impervious to components 

in cement and pool chemicals. No maintenance of fiber tips is necesary. The light conductors in STARRY SKY have a 

20-year guarantee if installed in accordance with the specification of this manual.

1. INSTALACIÓN

La instalación de STARRY SKY en superficies de hormigón no tiene dificultad alguna, a pesar de ser un procedimiento 

lento en función del número de puntos. Hasta la fecha, AFO ha suministrado miles de sistemas similares para instala-

ciones en ochenta países.

2. DENSIDAD DE PUNTOS

El número de puntos depende de apreciaciones estéticas subjetivas. La experiencia sugiere que los ejemplos más im-

pactantes contienen densidades de 4 a 8 puntos por metro cuadrado.

3. DISTRIBUCIÓN

Un error común es la distribución uniforme de los puntos. Los firmamentos tienen aspecto más realista si las estrellas 

están distribuidas de forma aleatoria, con zonas más densas y otras con menos o ningún punto.

Recomendamos dejar un perímetro de 20 a 30cm libre de puntos para un efecto más real, excepto en diseños de piscina 

que incorporen espejos de infinito.

4. UBICACIÓN DE LOS ILUMINADORES

Las normas de seguridad varían en los diferentes países, pero en general las luminarias con alimentación a 12VCA no 

tienen limitaciones. Dentro de lo posible, los iluminadores deben emplazarse cerca del efecto para reducir la longitud de 

las fibras y optimizar el rendimiento del sistema.

5. MANTENIMIENTO Y GARANTÍA

Los polímeros en el revestimiento de las fibras STARRY SKY están libres de halógenos, tienen resistencia al fuego M1 

y son inertes ante los componentes del cemento y los productos químicos en piscinas. Los extremos de las fibras no 

precisan mantenimiento. Los conductores ópticos en STARRY SKY tienen una garantía de 20 años si se instalan de 

acuerdo con las instrucciones de este manual.

Содержание STARRY SKY

Страница 1: ...STARRY SKY INSTALLATION AND MAINTENANCE MANUAL MANUAL DE INSTALACI N Y MANTENIMIENTO MANUEL D INSTALLATION ET D ENTRETIEN MANUALE DI INSTALLAZIONE E MANUTENZIONE www ignialight com...

Страница 2: ...ce with the specification of this manual 1 INSTALACI N La instalaci n de STARRY SKY en superficies de hormig n no tiene dificultad alguna a pesar de ser un procedimiento lento en funci n del n mero de...

Страница 3: ...S Y OTROS VASOS DE HORMIG N STARRY SKY debe instalarse cuando el vertido del hormig n haya concluido y se haya retirado el encofrado pero previo al alicatado o la aplicaci n de acabados Si el hormig n...

Страница 4: ...s el di metro id neo del tubo C es 40mm Para otras cantidades de fibra la tabla D lista las capacidades de otros tubos coarrugados On the vertical surface below the access point C prepare a zone to lo...

Страница 5: ...unto con aerosol o pintura indeleble B Aseg rese de que los puntos est n distribuidos aleatoriamente con amplias zonas vac as C y grupos o conjuntos D Omita los puntos en un per metro de 200 a 300 mm...

Страница 6: ...superficie del mismo En la solera distribuya las fibras hacia cada soporte C con precauci n para que no se monten y sobresalgan de la capa de nivelaci n Asegure cada fibra HCF 201 a los soportes UFF...

Страница 7: ...over dry usually after twenty four hours A Remove the upper tie from all fiber supports B with sharp cutting pliers the small pliers used in electronics are ideally suited for this task Carefully ben...

Страница 8: ...y 1 1 PISCINAS Y OTROS VASOS DE HORMIG N PIEZAS CER MICAS DE MEDIO Y GRAN FORMATO VIDRIO M RMOL Y PIEDRAS NATURALES La instalaci n de STARRY SKY en piscinas forradas de piezas cer micas excepto mosaic...

Страница 9: ...herramientas de nivelaci n Las fibras C deben mantenerse libres de adhesivo Commence laying the tiles along a true edge keeping at least the first course see 1 0 3 free of fibers In the places with fi...

Страница 10: ...y retire el exceso de lechada una vez que esta est bien seca Corte las fibras al ras de la soler a con una he rramienta afilada C Carefully check over that the fiber points are well set in grout with...

Страница 11: ...hese inexpensive tools accurate notches and shapes can be produced in a short time 1 2 PISCINAS Y OTROS VASOS DE HORMIG N MOSAICOS Integrar fibras en revestimientos de mosaico es mucho m s f cil que e...

Страница 12: ...con fibras A continuaci n coloque el panel cer mico de forma que las fibras afloren por los huecos sin loseta C Con una esp tula o form n romo elimine el adhesivo alrededor de las fibras Reserve las...

Страница 13: ...ado es preciso que el adhesivo seque y frag e 24 horas Pour and work well with a squeegee the finishing slurry into the joints A ensuring that the notches around the fibers don t have any voids Clean...

Страница 14: ...s or housings in ceramic tiles or natural stone slabs Fig 1 or in the joints between them Fig 2 2 OTROS PARAMENTOS HORIZONTALES SOLADOS O ALICATADOS La instalaci n en paramentos forrados de materiales...

Страница 15: ...esde el emplazamiento del iluminador conduzca las fibras por una canalizaci n C adecuada ver 1 0 1 y distribuya sobre la superficie a solar D reparta las fibras para que coincidan con los puntos marca...

Страница 16: ...onal sin da ar las fibras B Aunque las fibras se manchen de lechada su capacidad de transmisi n de luz permanece intacta Limpie y retire el exceso de lechada una vez que esta est bien seca Corte las f...

Страница 17: ...a superficie D En este punto las fibras deben ser entre 50 y 60cm m s largas para compensar ajustes y distribuci n Set tiles in place A pulling the fibers through the space in the joints B before tamp...

Страница 18: ...das C contin e colocando piezas D y limpie la obra sin mover las fibras hasta que el mortero se endurezca al tacto Once the mortar has sufficiently hardened trim the fibers flush with the wall surface...

Страница 19: ...xi C los soportes UFF 402 tal como se describe en 1 0 4 Puede ser necesario anclar los soportes con cinta adhesiva u otros medios para inmovilizarlos hasta que frag e el adhesivo From the illuminator...

Страница 20: ...Aunque las fibras se manchen o cubran de cemento u otro material su capacidad transmisora de luz no se ver afectada Once the surface is dry A apply paint or finish as required The fibers don t need a...

Страница 21: ...ntre hiladas C contin e colocando piezas D y limpie la obra sin mover las fibras hasta que el mortero se endurezca al tacto Once the mortar has sufficiently hardened trim the fibers flush with the wal...

Страница 22: ...einforcement and the base of the slab Secure each fiber to the uppermost layer of rebar or mesh ensuring the fas tened fibers are as vertical as possible Depending of the technique used for pouring th...

Страница 23: ...le details of illuminator installation are described in the following pages 5 ILUMINADOR 5 1 ILUMINADOR INSTALACI N Con alimentaci n a 12VCA desde un transformador magn tico est ndar no se incluye en...

Страница 24: ...nto se ha practicado en tierra de jardin es preciso la instalaci n de un encachado de piedra con 200mm m nimo de grosor B sobre tuber a drenante C hacia la arqueta de aguas residuales del jard n nunca...

Страница 25: ...e del iluminador H La calidad de este empalme es cr tico para evitar futuros problemas por ingreso de humedad Si la instalaci n se efect a bajo la superficie es necesario utilizar un conector IP68 Ins...

Страница 26: ...e situarse a una profundidad m nima K de 200mm Si la zona donde se ubica el iluminador es susceptible al tr fico peatonal deben instalarse las protecciones necesarias para evitar el aplastamiento de l...

Страница 27: ...Operating voltage 12VAC Power drain at 12VAC 4 3W Protection grade IP65 6 INFORMACI N DEL KIT 6 1 INFORMACI N DEL KIT CONTENIDO A Conjunto de 40 conductores pticos con 1mm de di metro activo 10x6m 10...

Страница 28: ...S CARACTERISTIQUES TECHNIQUES CARACTERISTICAS T CNICAS DATI TECNICI Made in EC Sacopa S A U Pol Ind Poliger Sud Sector I 17854 Sant Jaume de Llierca Spain info ignialight com www ignialight com I1089E...

Отзывы: