EN
6 - USE AND OPERATION
SMART320
6 - Pag. 12 / 22
6.5
BAR FEEDER SET-UP AND AUTOMATIC CYCLE START
The following list is a sequence of feeder set-up and automatic cycle start operations required if
the feeder has to be started up for the first time.
• Perform the software parameterization (refer to the "Keyboard Instruction Manual")
• Set up according to the bar to be machined (§ "Setup according to the bar to be machined"
Chap 5.)
• Prepare the bars to be machined (§ "Bars to be machined – features and preparation" Chap
6).
• Fill the bar magazine (§ “Bar magazine – filling”, Chap. 6).
• Adjust the lubricating oil flow (§ "Lubricating oil – flow regulation" Chap 6).
• Start the automatic cycle (§ "Automatic cycle start" Chap 6).
Содержание Smart 320 Tp
Страница 2: ......
Страница 4: ......
Страница 6: ......
Страница 12: ...EN 1 GENERAL INFORMATION SMART320 1 Pag 6 6 ...
Страница 62: ...EN 4 HANDLING AND INSTALLATION SMART320 4 Pag 26 26 ...
Страница 110: ...EN 7 BAR FEEDER MAINTENANCE SMART320 7 Pag 6 6 ...
Страница 114: ...EN 8 TROUBLES CAUSES SOLUTIONS SMART320 8 Pag 4 4 ...
Страница 120: ...EN 9 PART REPLACEMENT SMART320 9 Pag 6 6 ...