7 - BAR FEEDER MAINTENANCE
SIR-52-P/F
EN
7 - Pag. 9 / 20
7.2.11 Clamps device and bar-pusher locking - Alignment check
Check the clamps device (A) axis (fig. 11) is
aligned with the guide tube axis.
Keep to the following procedure: move the clamp
device to the "bar insertion into collet" position
and close the sprockets by pressing key
.
Sprockets must close without interfering with the
bar pusher inserted into the clamp device.
In case of misalignment, please apply to IEMCA
technical assistance department.
7.2.12 Hydraulic joint - Check
In case of troubles to the rotating joint (A)
(fig. 12) apply to IEMCA technical
assistance department.
Содержание SIR 52 P
Страница 4: ......
Страница 20: ...EN 2 TECHNICAL INFORMATION SIR 52 P F 2 Pag 12 16 2 6 TECHNICAL INFORMATION...
Страница 50: ...EN 4 HANDLING AND INSTALLATION SIR 52 P F 4 Pag 22 22...
Страница 126: ...EN 8 TROUBLES CAUSES CURES SIR 52 P F 8 Pag 6 6...
Страница 127: ...9 PART REPLACEMENT SIR 52 P F EN 9 Pag 1 4 INDEX 1 KEYBOARD BATTERY REPLACEMENT 2 9 2 PLC BATTERY REPLACEMENT 3...
Страница 130: ...EN 9 PART REPLACEMENT SIR 52 P F 9 Pag 4 4...
Страница 136: ...EN 10 GUIDE CHANNELS BAR PUSHER REVOLVING TIPS SIR 52 P F 10 Pag 6 6...
Страница 147: ...11 COLLETS SIR 52 P F EN 11 Pag 11 34...
Страница 165: ...11 COLLETS SIR 52 P F EN 11 Pag 29 34...
Страница 171: ...12 LIST OF AFTER SALES CENTERS SIR 52 P F EN 12 Pag 1 4 INDEX 12 1 LIST OF AFTER SALES CENTERS 2...
Страница 174: ...EN 12 LIST OF AFTER SALES CENTERS SIR 52 P F 12 Pag 4 4...