EN
4 - HANDLING AND INSTALLATION
SIR-52-P/F
4 - Pag. 12 / 22
4.4.4 Alignment
INFORMATION
Operation to be carried out by IEMCA
skilled personnel only.
- Move the drum backwards of 500 mm approx.
- Stretch a nylon thread (ø 1 mm) between the
bar feeder and the lathe collet, as follows:
• fit thread holding block (A) instead of the
last sprocket pair;
• position a plug (B) with hole ø 1,5 mm.( to
be manufacted by the client )into the lathe
collet;
• stretch nylon thread (C), moving the drum
backwards and locking the displacement to
keep the thread stretched.
Содержание SIR 52 P
Страница 4: ......
Страница 20: ...EN 2 TECHNICAL INFORMATION SIR 52 P F 2 Pag 12 16 2 6 TECHNICAL INFORMATION...
Страница 50: ...EN 4 HANDLING AND INSTALLATION SIR 52 P F 4 Pag 22 22...
Страница 126: ...EN 8 TROUBLES CAUSES CURES SIR 52 P F 8 Pag 6 6...
Страница 127: ...9 PART REPLACEMENT SIR 52 P F EN 9 Pag 1 4 INDEX 1 KEYBOARD BATTERY REPLACEMENT 2 9 2 PLC BATTERY REPLACEMENT 3...
Страница 130: ...EN 9 PART REPLACEMENT SIR 52 P F 9 Pag 4 4...
Страница 136: ...EN 10 GUIDE CHANNELS BAR PUSHER REVOLVING TIPS SIR 52 P F 10 Pag 6 6...
Страница 147: ...11 COLLETS SIR 52 P F EN 11 Pag 11 34...
Страница 165: ...11 COLLETS SIR 52 P F EN 11 Pag 29 34...
Страница 171: ...12 LIST OF AFTER SALES CENTERS SIR 52 P F EN 12 Pag 1 4 INDEX 12 1 LIST OF AFTER SALES CENTERS 2...
Страница 174: ...EN 12 LIST OF AFTER SALES CENTERS SIR 52 P F 12 Pag 4 4...