Operation
40
The following information is indicated by the relevant
LED:
LED
Colour
Status information
BT
Yellow,
flashing
Initialisation when
started
Blue
Bluetooth
®
connection/
data transmission
Yellow
Warning
Red
Error in Bluetooth
®
module
Mobile
communic
ations
network
Yellow,
flashing
Initialisation when
started
Green
Mobile connection/
data transmission
Yellow
Warning
Red
Error in mobile
communication module
System
Yellow,
flashing
Initialisation when
started
Green
System ready for
operation
Yellow
Warning
Red
Error
5.2
Transferring the measurement values
The
eConnect
is functional as soon as the “
System
”
LED lights up green.
The regular data transmission procedure from the
measuring device to the
eConnect
and the process of
forwarding data from there is as follows:
1)
Check whether the “
System
” LED on the
eConnect
is lit green.
2)
Start a measurement with your measuring
device.
3)
After the measurement, a Bluetooth
®
connection
between the measuring device and the
eConnect
is established.
4)
The "
BT
” LED on the
eConnect
is lit blue.
5)
The measurement data is transferred from the
measuring device to the
eConnect
.
6)
The
eConnect
establishes a connection to the
mobile communication network.
7)
The “
Mobile communication
” LED lights up
green.
8)
Your measurement data is being transferred to
the external database by the
eConnect
.
9)
After data transmission, the “
BT
” and “
Mobile
communication
” LEDs go out.
Содержание eConnect
Страница 1: ...Instructions to Use EN ...