21
5 - UNPACKING AND INSTALLATION
ADI MOUNTING SEQUENCE
WARNING!
For fixing the bases and photocell post follow the instructions on pages 17, 18 and 19.
1 - Installation of arches (
A-A1
) on the anchor base (
B-B1
).
3 - Connect the arc to the pumping module (
C
) with the polyamide tube kit (detail
1
)
4 - Position the photocell kit (
D
) and connect the connector (
E
).
5 - Place the 2 plastic platforms with L = 2 m on the passages
(F-F1
).
A
A1
B
B1
C
D
E
F
F1
1
Detail 1 - polyamide pipe connections
30 cm
170 cm
left arc
right arc
pipe connected to the pumping module
“T” fitting
Содержание Adi
Страница 30: ...30 NOTES ...
Страница 31: ...31 NOTES ...