
16
transmitter
receiving
1 - Fill the tank.
2 - Remove the highest nozzles of the arc (
A
)
3 - Operate the system by pressing the ON/OFF switch on the control panel.
4 - Occlude the photocells in order to keep the system running.
5 - Operate the system until the system has been emptied of all air present in the circuit.
6 - Stop the plant.
7 - Refit the nozzles (
A
).
8 - Remove the occlusion from the photocells.
9 - Check the correct nebulization.
FIRST START INSTRUCTIONS
A
A
5 - UNPACKING AND INSTALLATION
Содержание Adi
Страница 30: ...30 NOTES ...
Страница 31: ...31 NOTES ...