
Engineering
42
HR9Z-B2190 8/2020
Dynamization
Dynamization of Inputs
Dynamization is used for cross circuit detection between the control output and an input channel
of the safety-related input or between the safety-related input and the Start input or a cross-circuit
to an external power supply unit or to ground. Dynamization is implemented by means of
periodically generated test pulses at the control outputs of the safety-related inputs S#1 and of the
start input Y1.
Whether dynamization of the safety-related inputs is used depends on the selected application
function
The following diagram illustrates the dynamization principle and timing:
The same logic applies to Y1 and Y2.
Designation
Value
Explanation
T
DDUR
2 ms
Duration of the test pulse. The duration of the test pulse is the
time between the start of the test pulse and the end of the test
pulse.
T
DINT
500 ms
Interval between test pulses. This interval is the time between the
start of a test pulse and the start of the next test pulse at the same
control output.
T
DDEL
40 ms
Maximum delay of test pulse. This delay is the maximum time
between the start of the test pulse at the control output and the
associated input channel, that is, the maximum time during which
the input expects to “see” dynamization.
Содержание HR6S Series
Страница 1: ...http www idec com HR6S AB Safety Module Original instructions HR9Z B2190...
Страница 8: ...8 HR9Z B2190 8 2020...
Страница 14: ...14 HR9Z B2190 8 2020...
Страница 20: ...Introduction 20 HR9Z B2190 8 2020...
Страница 54: ...Installation 54 HR9Z B2190 8 2020...
Страница 80: ...Diagnostics 80 HR9Z B2190 8 2020...
Страница 86: ...Accessories Service Maintenance and Disposal 86 HR9Z B2190 8 2020...