background image

Further information

If you would like information about Ideal Boilers please complete this
sheet and fax it to us on 01482 498699 or post it to Caradon Plumbing
Limited, PO Box 103, National Avenue, Kingston upon Hull, HU5 4JN.

Installer details

Name

Address

Post Code

Telephone (

Please include STD code

)

General information required

Please send me details of Ideal Training Courses.

Please arrange for a technical representative to contact me.

Please arrange for me to join an Ideal factory tour.

Range guides required

The Ideal Guide: a specifier's and installer's introduction to the
Ideal domestic boiler range.

The Ideal Householders Guide: to assist the installer when
presenting to his/her customers.

Technical manuals required

The Ideal C class combi boiler

The Ideal Classic wall hung boiler

The Ideal Classic System wall hung boiler

The Ideal Classic LX Deluxe wall hung boiler

The Ideal Mexico floor standing boiler

The Ideal Minimiser heat-saving boiler

The Ideal Response combi boiler

The Ideal Response SE super efficiency combi boiler

The Ideal Systemiser SE super efficiency system boiler

The Ideal Concord high output boiler

The Ideal Buccaneer oil fired boiler

U.I.N. 151 905 A0

Caradon Plumbing Limited, PO Box 103, National Avenue, Kingston upon Hull, HU5 4JN.  Telephone: 01482 492251  Fax: 01482 448858.

Ideal Installer/Technical Helpline Tel: 01482 498 663

Содержание Mexico Slimline CF3/40

Страница 1: ......

Страница 2: ...mline models at only 250mm wide and 8 propane Super models Option kit availability includes an easy to use programmer kit available on all models an overheat thermostat kit for all models and a pump k...

Страница 3: ...ing balanced flue terminal kg lb 94 207 Boiler Size Height mm in 850 33 5 Width mm in 255 10 0 Depth mm in 535 21 0 Gas Type Natural 2 H Gas Supply Pressure 20 mb GENERAL Table 1 General Data Table 2...

Страница 4: ...ssembly Exploded view 9 Boiler Clearances 6 Burner Assembly Exploded view 34 Electrical Connections 15 Electrical Diagrams 15 Electrical Supply 8 Fault Finding 31 Flue Connection 15 Flue Installation...

Страница 5: ...misers etc are directly connected to these appliances unless covered by these Installation and Servicing Instructions or otherwise recommended by Caradon Plumbing Limited in writing If in doubt please...

Страница 6: ...ber Framed Buildings If the boiler is to be fitted in a timber framed building it should be fitted in accordance with the Institute of Gas Engineering document IGE UP 7 1998 Compartment Installations...

Страница 7: ...ations of BS 5440 1 The following notes are intended for general guidance 1 The cross sectional area of the flue serving the boiler MUST NOT be less than the area of the flue outlet of the boiler If f...

Страница 8: ...system should be in accordance with BS 6798 and in addition with BS 5449 1 for smallbore and microbore systems The domestic hot water system if applicable should be in accordance with the relevant re...

Страница 9: ...N INSTALLATION 3 BOILER ASSEMBLY Exploded View 6 Front plate assembly 9 Main burner 15 Gas valve 17 Piezo unit LEGEND 1 Heat exchanger 2 Boiler feet assembly 3 Thermostat pocket 4 Cleanout cover 21 Ga...

Страница 10: ...these Installation and Servicing Instructions z User s Instructions INSTALLATION INSTALLATION To avoid damage to the boiler casing it is recommended that the casing is removed BEFORE the boiler body i...

Страница 11: ...panel by lowering and pulling it forward In order to remove the control panel entirely the TTB thermostat has to be carefully released 5 Remove the 2 screws securing the top panel to the side 6 Draw...

Страница 12: ...ssure of 20 mbar 8 in w g MUST be available at the boiler inlet with the boiler operating 2 Extend a gas supply pipe NOT LESS THAN 15mm 1 2 OD to the boiler and connect to the gas cock situated at the...

Страница 13: ...n Frame 1 2 The boiler is assumed to be the highest point of the circulating system 3 The circulating pump is positioned on the FLOW and the vertical distance between the pump and feed expansion tank...

Страница 14: ...ven in Frame 1 but ONLY those shown should be used 2 The use of a cylinder thermostat is recommended This will prevent excessive DHW temperatures and thus reduce gas consumption 3 The schematic pipewo...

Страница 15: ...ble NOT LESS than 0 75 mm2 24 x 0 2 mm to BS 6500 Table 16 14 INTERNAL WIRING Flow and pictorial wiring diagrams are shown in Frames 15 and 16 A schematic wiring diagram is included in the Lighting In...

Страница 16: ...ot arise providing the following directions are observed 1 Controls that switch the system ON and OFF e g a time switch MUST be wired in series in the live mains lead to the boiler 2 Controls that ove...

Страница 17: ...oiler thermostat to maximum 4 Switchmaster Autozone has grey and orange auxiliary switch leads but the GREY NOT the orange wire must be connected to the incoming live supply LEGEND b blue bk black or...

Страница 18: ...stat should be wired into the system This is usually done at the programmer in which case the programme selector switches are set to OFF and all other controls MUST be left in the running position The...

Страница 19: ...ion on the gas service cock on the boiler and purging until gas is detected 3 Retighten the union and check for gas soundness WARNING Whilst effecting the required gas soundness test and purging air f...

Страница 20: ...nvelops the tip of the thermocouple and is approximately 25mm 1 long The pilot flame is factory set and no adjustment is possible 8 Switch the boiler thermostat control knob H to position 6 and check...

Страница 21: ...should be fully explained to the householder to ensure the greatest possible fuel economy consistent with household requirements of both heating and hot water consumption Advise the User of the preca...

Страница 22: ...nstalled in a compartment check that the ventilation areas are clear The servicing procedures are covered more fully in Frames 28 to 32 and MUST be carried out in sequence WARNING Always turn OFF the...

Страница 23: ...burner head ensuring that the flame ports are unobstructed and remove any debris that may have collected Note Brushes with metallic bristles MUST NOT be used 3 Remove the main burner injector Check c...

Страница 24: ...glass in the front plate clean or renew as necessary 6 Renew any damaged or deteriorating front plate gasket 7 Refit the burner and controls assembly 8 Reconnect the gas service cock 9 Refit the grill...

Страница 25: ...studs on the gas valve and withdraw the unit as shown 3 Fit the new unit and reassemble in reverse order 35 PIEZO UNIT REPLACEMENT 36 PILOT BURNER REPLACEMENT 1 Lift off lower front panel and remove...

Страница 26: ...e electrical connections from the gas valve 4 Unscrew the 2 screws and pull down the control panel so that the 2 tabs clear the top panel 5 Remove the bottom screw and remove the cover from the contro...

Страница 27: ...n the thermostat sits in the small hole adjacent to the main fixing hole and reassemble in reverse order 1 Lift off lower front panel and remove the grille assembly Undo the gas cock union Remove the...

Страница 28: ...nut and withdraw the electrode upward Re assemble in reverse order 42 THERMOCOUPLE REPLACEMENT 1 Lift off lower front panel and remove the grille assembly Undo the gas cock union Remove the burner an...

Страница 29: ...off lower front panel and remove the grille assembly Undo the gas cock union Remove the burner and controls assembly Refer to Frames 27 28 Undo the 2 wing nuts and remove the burner and controls asse...

Страница 30: ...nd lead and re assemble in reverse order ensuring that all electrical connections are correctly remade and cables secured 1 Lift off lower front panel and remove the grille assembly Undo the gas cock...

Страница 31: ...plied NO NO Allow time to purge any air present by increasing the pilot gas rate done by adjusting the screw Check that the gas control knob is being pressed fully in that there is gas pressure at the...

Страница 32: ...038 19 E01 412 HT lead 460mm long 1 052 888 20 390 039 Thermocouple HONEYWELL Q 309 A 2739 600mm lg 1 000 842 25 Thermostat RANCO K36 P1354 1 151 903 26 308 557 Thermostat knob 1 111 904 41 E01 415 Fl...

Страница 33: ...33 Mexico Slimline CF 3 40 3 50 Installation LIST OF PARTS 50 SHORT PARTS...

Страница 34: ...T OF PARTS Legend 6 Front plate assembly 7 Sightglass assembly 8 Pilot pipe 9 Main burner 11 Main burner injector 12 Pilot burner 14 Pilot burner bracket assy 15 Gas valve 16 O ring 17 Piezo unit 18 I...

Страница 35: ...40 3 50 Installation LIST OF PARTS 52 CONTROL BOX ASSEMBLY Exploded View Legend 23 Control panel complete 24 Control box 25 Control thermostat 26 Thermostat knob 27 Controls panel 28 Magnetic strip 2...

Страница 36: ...40 3 50 Installation 53 BOILER CASING ASSEMBLY LIST OF PARTS Legend 22 Casing complete 23 Control panel complete 32 L H side panel 33 R H side panel 34 Top panel 35 Grille panel 36 Front lower panel 3...

Страница 37: ...37 Mexico Slimline CF 3 40 3 50 Installation...

Страница 38: ...Training Caradon Plumbing Limited pursues a policy of continuing improvement in the design and performance of its products The right is therefore reserved to vary specification without notice THIS SY...

Страница 39: ...e ll be giving away a free boiler for the five best ideas every year to be selected by our Technical Director Please complete this form using extra sheets if required and post it or fax it to us on 01...

Страница 40: ...deal domestic boiler range The Ideal Householders Guide to assist the installer when presenting to his her customers Technical manuals required The Ideal C class combi boiler The Ideal Classic wall hu...

Отзывы: