51
sERVICING
Ideal Logic Combi -
Installation and Servicing
75 BOILER sEaLING PaNEL sEaL REPLaCEMENT
74 ExPaNsION VEssEL REChaRGING & REPLaCEMENT
8
9
1.
Refer to Frame 49.
2.
Remove the old seal from the casing and
thoroughly clean the casing surfaces.
3.
Fit the new seal, ensuring the bottom joint
provides an air tight seal.
5.
Reassemble in reverse order.
6.
Check operation of the boiler. Refer to
Frames 38 & 39.
Note.
Ensure that the boiler front panel is
correctly sealed, compressing the seal
to make an airtight joint.
REChaRGING
1.
Refer to Frame 49.
2.
Remove the charge point cover.
3.
Recharge the tank pressure to 0.75 bar.
4.
Re-assemble in reverse order
5.
Check operation of the boiler. Refer to Frames
38 & 39.
REPLaCEMENT
6.
Refer to Frame 49.
7.
Drain the boiler CH circuit. Refer to Frame 62.
8.
Unscrew the union nut on the vessel water
connection pipe.
9.
Support the expansion vessel and unscrew
the 2 screws from the securing clamp, located
on the top of the boiler, and remove. (Note the
position of the bracket on the vessel)
10.
Remove the expansion vessel.
11.
Fit the new expansion vessel.
12.
Reassemble in reverse order.
13.
Refill the boiler. Refer to Frame 30.
14.
Check operation of the boiler. Refer to Frames
38 & 39.
Recharge
Point
s
ER
VICING
204626-8.indd 51
25/08/2011 13:16:20
Содержание LOGIC+ Combi 24
Страница 2: ...2 Ideal Logic Combi Installation and Servicing...
Страница 61: ......