30
INsTaLLaTION
Ideal Logic Combi -
Installation and Servicing
35 ExTERNaL ELECTRICaL CONTROLs
Wiring External to the Boiler
The fuse rating should be 3A.
Wiring external to the boiler MUST be in accordance with the current
I.E.E. (BS.7671) Wiring Regulations and any local regulations.
Frost Protection
If parts of the pipework run outside the house or if the boiler will be left off
for more than a day or so then a frost thermostat should be wired into the
system.
This is usually done at the programmer, in which case the programmer
selector switches are set to OFF and all the other controls MUST be left in
the running position.
The frost thermostat should be sited in a cold place but where it can
sense heat from the system.
Note
.
If the boiler is installed in a garage it may be necessary to fit a pipe
thermostat, preferably on the return pipework.
3G9503
L N
Room Stat
Timer
Room stat
Frost Stat
Mains In
Separate Timer and Room Stat
L N
Room Stat
Frost Stat
Mains In
Programmable Room Stat
L N
Room Stat
Frost Stat
Mains In
Use of General Live for Room Stat
Programmable
Room
Stat
Room
Stat
Optional
Frost Stat
Optional
Frost Stat
Optional
Frost Stat
3G9560
N
L
N
FROST
STAT
(
OPTIONAL
)
ROOM
STAT/
TIMER
Room
Stat or
Prog.
Room
Stat
Optional
Frost Stat
DIAGRAM A
Internal Timer or
Programmable Room Stat
3G9561
N
L
N
FROST
STAT
(
OPTIONAL
)
ROOM
STAT/
TIMER
Room
Stat
Optional
Frost Stat
DIAGRAM B
External
Timer
34 REPLaCING PRE-FITTED MaINs CaBLE
If it is necessary to use an alternative mains cable to the one pre-fitted then use the
following guide.
Replacement wiring should comply with notes in Frame 31.
1.
Isolate the mains supply to the boiler.
2.
Remove the front panel. Refer to Frame 43.
3.
Swing the control box down into the service position. Refer to Frame 49.
4.
Remove the live, neutral and earth wires from the terminal block.
5.
Loosen the cable clamp and withdraw the mains cable.
6.
Route replacement cable back through the cable clamp and grommet and re-tighten
to provide cord anchorage.
7.
Connect the live, neutral and earth wires to the terminal strip. When making the
mains electrical connections to the boiler it is important that the wires are prepared in
such a way that the earth conductor is longer than the current carrying conductors,
such that if the cord anchorage should slip, the current carrying conductors become
taut before the earthing conductor.
8.
Swing the control box back up into the operating position and re-fit the front panel
ensuring a good seal is made.
5
4
Earths are not shown for clarity but must
never be omitted.
33 INTERNaL WIRING
IN
s
T
a
LL
a
TION
204626-8.indd 30
25/08/2011 13:16:02
Содержание LOGIC+ Combi 24
Страница 2: ...2 Ideal Logic Combi Installation and Servicing...
Страница 61: ......