50
sERVICING
Ideal Logic Combi -
Installation and Servicing
14
11
12
10
73 hEaT ENGINE RENEWaL
Refer also to Frame 6 - ‘Boiler Exploded View’
IMPORTaNT
Before starting the removal procedure, protect the gas and electrical controls with a waterproof sheet or plastic bag.
11.
Undo the inlet pipe union nut and remove the retaining spring
clip and remove pipe.
12.
Undo the flow pipe union nut and remove pipe.
13.
Remove the condensate rubber pipe. Refer to Frame 59, no. 2.
14.
Remove the two heat exchanger fixing screws.
15.
Remove the Heat exchanger, slide out of location bracket.
16.
Reassemble in reverse order, ensuring the heat exchanger LH
retaining bracket is correctly positioned. Replace any new ‘o’
rings supplied with new heat exchanger and replacing gaskets
or seals if any sign of damage is evident. When replacing the
spring clips located on the return pipe connection, ensure clip is
oriented to correctly match connecting pipe diameters.
17.
Ensure the trap/siphon is filled with water. Refer to Frame 59.
18.
Refill the boiler. Refer to Frame 30.
19.
Check operation of the boiler. Refer to Frames 38 & 39.
1.
Refer to Frame 49.
2.
Drain the boiler. Refer to Frame 62.
3.
Remove the fan / venturi assembly and place on one side.
Refer to Frame 50.
4.
Remove the burner and place on one side. Refer to Frame
52.
5.
Remove the ignition and detection electrodes and divertor
actuator head. Refer to Frames 54, 55 and 58.
6.
Remove the spark generator. Refer to Frame 56.
7.
Remove the gas valve. Refer to Frame 57.
8.
Remove the expansion vessel. Refer to Frame 74.
9.
Remove the flow thermistor. Refer to Frame 72.
10.
Remove the 2 M5 screws retaining the gas valve mounting
bracket and transfer bracket to the new heat exchanger.
sER
VICING
204626-8.indd 50
25/08/2011 13:16:19
Содержание LOGIC+ Combi 24
Страница 2: ...2 Ideal Logic Combi Installation and Servicing...
Страница 61: ......