5
Operating instructions
When the operating flap is first opened after
voltage is applied, the level INSTALLATION is
displayed once only. Once the values grouped
here have been set the controller is operable.
Set the parameters:
ENGLISH, HOUR, YEAR, MONTH, DAY.
BUS - ID HS has to be left blank _ _
The remaining parameters are already set.
Warning:
In the following tables are shown the
factory
set
parameter
s
. For additional
information
refer to the E8 instruction manual
supplied
with the boiler.
Press to
enter
Level
ENGLISH
Set new
value
TIME
YEAR
MONTH
SETUP
DAY
1
1
1
1
1
Press to
enter
Level
Press to
enter
Level
Press to
enter
Level
Press to
enter
Level
Press to
enter
Level
Press to
enter
Level
E8 slave
E8 master
Imax Plus Imax Plus
-
Press 'Enter'
02 = 2 Stage (Not used)
01 = 50 (kW)
Continue until all are set
02 = 50
03 = 50 etc.
until Return reached.
Press 'Enter' to access the
next parameter screen
PLANT SELECT
=
HS 1 TYPE
HS 2 TYPE
BUFFER TYPE