background image

34

Henrad SEC FF - 

Installation

45 INITIAL LIGHTING

INSTALLATION

1.

Check that the system has been filled and that the
boiler is not airlocked. Ensure the automatic air vent
screw is open (N)

2.

Check that all the drain cocks are closed and that the
CH and DHW isolating valves are OPEN.

3.

Check that the electrical supply is OFF.

4.

Check that the gas service cock (

I

) is OPEN.

5.

Remove screw and swing the control panel down .

6.

Remove the screw in the burner pressure test point (C)
and connect a gas pressure gauge via a flexible tube.

7.

Swing the control panel into its working position.

8.

Ensure that the external CH controls are calling for heat
and set the switch (K) to ON.

9.

Switch the electricity supply ON.

10.

Set the switch (J) to ON.

11.

The boiler ignition sequence should now start.

Note.

A self-check cycle will take place whenever the RESET
button on the control panel is pressed, and also once
every 24 hours without a call for heat, to ensure
movement of the components once a day.

LEGEND

A.

Gas control valve

B.

Inlet pressure test point

C.

Burner pressure test point

D.

Offset adjuster (sealed)

E.

Fan pressure test point (Hi)

F.

Fan pressure test point (Lo)

G.

Control panel

H.

Display board

I.

Gas service cock (hidden)

J.

On/off switch

K.

Central heating (CH) on/off switch

L.

Central heating pressure gauge

M.

Flue thermostat (behind sealing panel)

N.

Automatic air vent

O.

Cover plate

Sequence

Boiler Status

0

No heat request.

1

Fan pre-purge for 8 seconds.

2

Gas valve opens and spark commences.

3

Burner ignition and flame detection (CH).

4

Burner ignition and flame detection (DHW)

Control panel 

: contains digital display and 6 buttons

Button

Function

RESET

Reset of system

MODE

Mode of display

STEP

Step within the mode

STORE

Storage of setting

UP(+)

Increase of setting

DOWN (-)

Decrease of setting

INST

ALLA

TION

Содержание Henrad SEC 80FF

Страница 1: ......

Страница 2: ...Henrad SEC FF Installation CAUTION To avoid the possibility of injury during the installation servicing or cleaning of this appliance care should be taken when handling edges of sheet steel component...

Страница 3: ...or 34 9 MJ m3 935 Btu ft3 nett To obtain the gas consumption at a different calorific value a FOR L S divide the gross heat input kW by the gross C V of the gas MJ m3 b FOR FT 3 H divide the gross he...

Страница 4: ...connection not available for HEES Flue Elbow Kits 90 degree 45 degree 2 per pack Refer to the separate fitting instructions supplied with each kit SEC FF Natural gas only G C Appliance No 47 348 10 De...

Страница 5: ...is drawn off The full output from the boiler is then directed via the diverter valve to the calorifier to supply a maximum DHW draw off of 10 l min at 35 o C temperature rise 1 BOILER WATER CIRCUIT DI...

Страница 6: ...ET The boiler must be installed on a flat and vertical wall capable of adequately supporting the weight of the boiler and any ancillary equipment The boiler may be fitted on a combustible wall and ins...

Страница 7: ...icrobore systems BS 5449 The domestic hot water system should be in accordance with BS 5546 and BS 6700 Copper tubing to BS 2871 1 is recommended for water carrying pipework and MUST be used for pipew...

Страница 8: ...1 It is most important that the correct concentration of the water treatment product is maintained in accordance with the manufacturers instruction 2 If the boiler is installed in an existing system a...

Страница 9: ...stalled in a room containing a bath or shower then the appliance and any electrical switch or appliance control utilising mains electricity should be so situated that it cannot be touched by a person...

Страница 10: ...oss from the system either a From a manually filled make up vessel with a readily visible water level The vessel should be mounted at least 150mm above the highest point of the system and be connected...

Страница 11: ...ent Guidance Notes for the Installation of Domestic Gas Condensing Boilers 1989 A condensate drain is provided on the boiler This drain must be connected to a drainage point on site All pipework and f...

Страница 12: ...flexible hose 35 Heat exchanger 48 Prepiping frame 50 Control panel 72 Gas injection pipe 18 Automatic air vent 19 Fan pressure sensing pipe 22 CH return pipe 24 Pump inlet pipe 25 Boiler return pipe...

Страница 13: ...ting template z These Installation and Servicing Instructions z User s Instructions z Stand off brackets optional use 1 pair z Concealment panels optional use 1 pair z Inner flue seal Stand off bracke...

Страница 14: ...1 2 22 3 4 4 1 2 16 4 1 2 21 1 4 580 1530 mm 410 1360 mm 540 1490 mm Pack B2 1 off 22 3 4 60 1 4 16 53 1 2 21 1 4 58 1 2 Extn Duct 1 off 1530 2480 mm 1360 2310 mm 1490 2440 mm Pack B2 1 off 60 1 4 97...

Страница 15: ...2 Ensure squareness by hanging a plumbline as shown 3 Mark onto the wall the following a The 4 wall mounting plate screw positions b The position of the flue duct Mark the centre of the hole as well...

Страница 16: ...tion masonry falling outside of the building does not cause damage or personal 14 FITTING THE PIPING FRAME Fit the wall mounting frame either A Directly to the wall z z z z z Insert wall plugs z z z z...

Страница 17: ...king gas pressure of 20mbr 8 w g must be avilable at the boiler inlet with the boiler firing at full DHW output Note Do not subject any of the isolating valves to heat as the seals may be damaged 16 G...

Страница 18: ...lift it from the boiler 18 CUTTING THE FLUE Rear Flue Length of 114 to 580mm Note If the optional standoff bracket kit is used it is essential that 80 mm is added to the measured wall thickness when...

Страница 19: ...ate trap within the boiler by pouring a cupful of water into the flue outlet A 1 Insert the flue assembly through the prepared hole in the wall far enough to allow the rubber seal to unfold completely...

Страница 20: ...The 4 wall mounting plate screw positions b The position of the flue duct Mark the centre of the hole as well as the circumference Note Allow for stand off brackets if being used Use the the table on...

Страница 21: ...ed around the groove provided The terminal wall plate need not be fitted 24 FITTING THE PIPING FRAME Fit the wall mounting frame either a Directly to the wall z z z z z Insert wall plugs z z z z z Put...

Страница 22: ...as supply pipe of not less than 22mm O D copper or 3 4 BSP iron to the boiler A working gas pressure of 20mbr 8 w g must be avilable at the boiler inlet with the boiler firing at full DHW output Botto...

Страница 23: ...lculated as follows a Measure and note the wall thickness X b Add dimension H measured in Frame 22 c For right hand side flue add 188mm 7 3 8 d For left hand side flue add 61mm 2 3 8 i e X H 188mm 7 3...

Страница 24: ...ert the flue assembly through the prepared hole in the wall far enough to allow the rubber seal to unfold completely and form an adequate seal on the outside wall 2 Pull the flue back and locate the f...

Страница 25: ...rainage pipework must be arranged so that obstruction e g through freezing of external drainage pipe does not give rise to spillage within the dwelling Excessive external pipe runs should be avoided i...

Страница 26: ...afety valve discharge pipe should be such that any discharge of water or steam does not create a hazard 4 Use the 900 compression elbow so that the pipe is directied towards the rear 33 SAFETY VALVE D...

Страница 27: ...the outer flue extension duct onto the outer air duct 5 Drill one 3 2mm 1 8 dia hole through the outer air duct Do not drill the inner flue duct 6 Insert the self tapping screw provided to fix the air...

Страница 28: ...4 INSTALLATION INSTALLATION Front elevation layout of boiler components control panel open Legend A Boiler heat exchanger B Gas valve C Safety valve D DHW plate heat exchanger E Condensate safety dra...

Страница 29: ...be a slight water leak from the vent therefore electrical connections should be protected c Ensure that the pump is free to rotate i Remove the vent plug ii Using a screwdriver rotate the shaft sever...

Страница 30: ...t allows complete isolation of the electrical supply such as a double pole switch having a 3mm 1 8 contact separation in both poles or a plug and socket serving only the boiler and system controls The...

Страница 31: ...ler otherwise the boiler can be left live even when the boiler isolating switch is off Using a two channel timer will disable the heating switch 3 Room Thermostat It is recommended to use a room therm...

Страница 32: ...32 Henrad SEC FF Installation INSTALLATION 42 PICTORIAL WIRING DIAGRAM INSTALLATION...

Страница 33: ...checks i e earth continuity polarity resistance to earth and short circuit using a suitable test meter B Gas Installation 1 The whole of the gas installation including the meter should be inspected a...

Страница 34: ...heck cycle will take place whenever the RESET button on the control panel is pressed and also once every 24 hours without a call for heat to ensure movement of the components once a day LEGEND A Gas c...

Страница 35: ...e all taps except the furthest one from the boiler and check that the boiler is firing at maximum rate 3 Release the boiler bottom panel 4 Turn the DHW flow regulator clockwise to reduce the DHW flow...

Страница 36: ...ame 6 7 Check the condensate drain for leaks and check that it is discharging correctly 8 Finally set the controls to the User s requirements 9 Refit the boiler bottom panel 10 If an optional timer ki...

Страница 37: ...to the required value by pressing and buttons d Store the new value by pressing the STORE button The display should flash twice e To return the control to the normal running STANDBY mode press the RE...

Страница 38: ...Advise the User of the precautions necessary to prevent damage to the system and to the building in the event of the system remaining inoperative during frosty conditions 5 Explain the function and t...

Страница 39: ...propriate z Check the sealing panel is correctly refitted ensuring that a good seal is made 53 CASING REMOVAL 54 BOILER SEALING PANEL REMOVAL 1 Release the 2 retaining clips 2 Swing the panel open to...

Страница 40: ...5 Depress the retaining clip and rotate the fan to the right to disengage the bayonet fixing on the fan outlet 6 Draw the fan forward and unplug the electrical lead from the motor 7 Withdraw the fan f...

Страница 41: ...et or similar beneath the boiler and remove all visible loose deposits from the heat exchanger fins using a suitable brush 2 Take care to clean debris from the ledge inside the combustion chamber 1 Pu...

Страница 42: ...BOILER MUST NOT BE OPERATED IF THE SEALING PANEL IS NOT FITTED Note In order to replace components in Frames 75 to 85 it is necessary to drain the boiler Refer to Frame 72 1 Refer to Frame 60 2 Remove...

Страница 43: ...newing any damaged or deteriorating gasket SERVICING Legend A Venturi B Sensing pipe 63 BURNER REPLACEMENT Legend A Burner B Gasket C Burner mounting flange D O ring seal Note Check the spark and dete...

Страница 44: ...ctrode 1 Refer to Frame 60 2 Remove the boiler casing Refer to Frame 53 3 Remove the boiler sealing panel Refer to Frame 54 4 Unscrew the injector from the injection pipe 5 Fit the new injector using...

Страница 45: ...mplete with mounting brackets and gas inlet pipe 10 Transfer the mounting brackets and sensing pipes to the new valve renewing any damaged or deteriorating sealing gaskets 11 Transfer the gas inlet pi...

Страница 46: ...display board Ensure that the control unit is the correct one for the boiler 7 Unplug the spark and detector leads 8 Undo the 4 securing screws and withdraw the control unit from the panel 9 Fit the...

Страница 47: ...ody 6 Fit the new actuator and re assemble in reverse order 7 Check the operation of the new actuator 72 DRAINING THE BOILER IMPORTANT In order to replace the components in Frames 73 to 85 it is neces...

Страница 48: ...cle 6 Pull off the trap from the bottom of the boiler 7 Withdraw the trap from the boiler 8 Fit the new trap and re assemble in reverse order 74 DHW THERMISTOR SENSOR REPLACEMENT 1 Refer to Frame 60 2...

Страница 49: ...hers provided and re assemble in reverse order 9 Check the operation of the new valve 75 CH THERMISTOR SENSOR REPLACEMENT Note There are 2 control thermistors one on the boiler flow boss and one on th...

Страница 50: ...y b The gauge is correctly orientated within the panel 1 Refer to Frame 60 2 Remove the boiler casing Refer to Frame 53 3 Drain the boiler Refer to Frame 72 4 Close the DHW inlet isolating valve and o...

Страница 51: ...9 Fit the new pump and re assemble in reverse order ensuring that a The new seals provided are fitted b The electrical connections are correctly remade c The pump selector switch is set at position 3...

Страница 52: ...omplete with O ring provided and re assemble in reverse order IMPORTANT Ensure that the vent cap is loose A 1 Refer to Frame 60 2 Remove the boiler casing Refer to Frame 53 3 Remove the boiler sealing...

Страница 53: ...s with a waterproof sheet or plastic bag 1 Refer to Frame 60 2 Remove the boiler casing Refer to Frame 53 3 Remove the boiler sealing panel Refer to Frame 54 4 Drain the boiler Refer to Frame 72 5 Dra...

Страница 54: ...the heat exchanger from below withdraw the bosses from the flow and return tappings Check the O ring seals for damage and replace if necessary 22 Lower the heat exchanger to disengage from the flue co...

Страница 55: ...est 1 Fan pre purge 2 Ignition 3 Burner on CH 4 Burner on DHW 5 Airflow switch not correct not applicable 6 Burner off in CH mode flow temperature T1 5 o C above set flow temperature Tset 7 Pump overr...

Страница 56: ...ut 4 05 4 06 4 4 07 4 10 4 11 4 13 4 14 4 15 4 16 4 17 4 24 Flow and return sensors NTC1 and NTC2 reversed 4 26 Minimum gas pressure 4 30 Maximum difference between T1 and T2 exceeded 4 31 NTC1 short...

Страница 57: ...139 950 9 E00 050 Water pressure switch SIT 1 075 176 10 E02 848 CH flow and return thermistor sensors and DHW thermistor sensors CROSSLAND COMPONENTS 3 150 260 11 E00 055 Pressure gauge ALTECNIC 1 13...

Страница 58: ...58 Henrad SEC FF Installation 89 SHORT PARTS LIST SHORT LIST OF PARTS...

Страница 59: ...ion electrode 13 Fan 14 Fan inlet venturi 19 Fan pressure sensing pipe 42 O ring 43 O ring 44 O ring 45 Gasket rubber 46 Gasket Cork 54 EV1 solenoid 55 EV2 solenoid 60 O ring 61 Burner gasket 70 Gas v...

Страница 60: ...d SEC FF Installation 91 CONTROL PANEL ASSEMBLY Exploded View Legend 6 Gasmodul control 7 Display board 8 Fan speed control board 11 CH pressure gauge 12 Rocker switch 50 Control panel 58 Relay LIST O...

Страница 61: ...61 Henrad SEC FF Installation 92 BOILER CASING ASSEMBLY SHORT LIST OF PARTS...

Страница 62: ...lephone 01482 492 251 Fax 01482 448 858 Registration No London 322 137 Registered Office National Avenue Kingston upon Hull HU5 4JN A subsidiary of Caradon plc October 2000 153 962 A05 The code of pra...

Страница 63: ...r suggestions for how to improve our boilers and our service We will be giving away a free boiler for the five best ideas every year to be selected by our Technical Director Please complete this form...

Страница 64: ...l information required Please send me details of Henrad Training Courses Please arrange for a technical representative to contact me Please arrange for me to join an Henrad factory tour Range guides r...

Отзывы: