2
mexico HE
-
Users
introduction
The
mexico hE
is a floor standing, room sealed,
condensing boiler featuring full sequence automatic spark
ignition and fan assisted combustion.
Due to the very high efficiency of the boiler condensate
is produced from the flue gases and this is drained to a
suitable disposal point through the plastic waste pipe at the
right lower rear of the boiler. A condensate ‘plume’ will also
often be visible at the flue terminal.
Safety
Current gas safety (Installation & Use)
Regulations or rules in force.
In your own interest, and that of safety, it is the law
that this boiler must be installed by a Gas Safe
Registered Engineer.
In IE the installation must be carried out by a
Registered Gas Installer and installed in accordance
with the current edition of I.S. 813 “domestic Gas
Installations”, the current Building Regulations and
reference should be made to the current ETCI rules
for electrical installation.
It is essential that the instructions in this booklet are
strictly followed, for safe and economical operation of
the boiler.
Electricity Supply
The appliance must be earthed.
Supply 230 V - 50 Hz. The fusing should be 3A.
This appliance is intended to be connected to the supply via a
double-pole switch, having a 3mm contact separation in both
poles, serving only the boiler and system controls. Alternatively, a
3-pin UNSWITCHED socket may be used.
important notes
• This appliance must not be operated without
the casing correctly fitted and forming an adequate seal.
• If the boiler is installed in a compartment then the compartment
MUST NOT be used for storage purposes.
• Under
NO circumstances should any of the sealed components
on this appliance be used incorrectly or tampered with.
•
If it is known or suspected that a fault exists on the boiler then it
MUST NO
T BE USED
until the fault has been corrected by a Gas
SA
fe Registered Engineer or in IE a Registered Gas Installer.
All Gas Safe Registered Engineers carry a Gas Safe Register ID card, and have a registration number. Both should be recorded
in the
Benchmark
Commissioning Checklist. you can check your installer by calling Gas Safe Register direct on 0800 4085500.
ThE BENChMARK sERVICE INTERVAL RECORD MUsT BE COMpLETED AFTER EACh sERVICE
Ideal Boilers
is a member of the Benchmark scheme and fully supports the aims of the programme.
Benchmark has been introduced to improve the standards of installation and commissioning of central
heating systems in the UK and to encourage the regular servicing of all central heating systems to ensure
safety and efficiency.
Destination Countries: gB, IE
mexico hE15, hE18, hE24, hE30, hE36
(Natural gas Only)
hE15
g.C. Appliance No. 41-429-39
hE18
g.C. Appliance No. 41-429-65
hE24
g.C. Appliance No. 41-429-98
hE30
g.C. Appliance No. 41-429-99
hE36
g.C. Appliance No. 41-415-20
•
This appliance is not intended for use by persons (including
children) with reduced physical, sensory or mental capabilities,
or lack of experience and knowledge, unless they have
been given supervision or instruction concerning use of the
appliance by a person responsible for their safety.
•
Children should be supervised to ensure that they do not play
with the appliance.
In cases of repeated or continuous shutdown a Gas Safe
Registered Engineer or in IE a Registered Gas Installer should
be called to investigate and rectify the condition causing this
and carry out an operational test after each intervention on the
device. Only the manufacturers original parts should be used for
replacement.
Minimum Clearances
Clearances of
20mm (3/4”
) above,
5mm (1/4”
) at the sides and
450mm (17 3/4
”) at the front of the boiler casing must be allowed
for servicing.
The minimum front clearance allowed when built into a cupboard
is 5mm.
To light the boiler
(Refer to Frame 1)
1.
CHECK THAT THE ELECTRICITy SUPPLy TO THE BOILER
IS OFF.
2.
Set the mains on/off switch (A) to off and the CH thermostat
knob (B) to maximum.
3.
Switch on the electricity supply to the boiler and check that all
external controls, e.g. programmer, room stat, etc. are on.
4.
Set the mains on/off switch to ON.
The boiler will commence the ignition sequence, supplying heat to
the system when required.
Operation
In normal operation the control unit display (E) will show the
codes:
O - standby
(no demand for heat)
C - Ch or DhW being supplied
p - Boiler frost protection
(boiler will fire when temperature is
less than 3
o
C)
During
ignition
the LED (D) will flash.
During
normal running
the LED will remain illuminated.
Note.
If the boiler fails to light after 3 attempts the fault code ‘L’ ‘F’
will be displayed.
Press and hold the reset button (C) for 2 seconds then release.
The boiler will repeat the ignition sequence. If the boiler fails
to light consult a Gas Safe Registered Engineer or in IE a
Registered Gas Installer.
Содержание he15
Страница 2: ...2 mexico HE Installation Servicing...
Страница 50: ......