Chapter 3
Structured Cable Field Calibration and Testing
3-3
To calibrate the tester, perform the following:
Steps 1 and 2
¾
Connect the GG45 Calibration Adapters to the Display Handset (DH) and Remote
Handset (RH). Power both units on.
¾
From the DH Ready screen, select Field Calibration. The Calibration screen
appears.
¾
From the DH Field Calibration screen, select START to begin the first calibration
process. When this process ends, select START again to perform the second
calibration process. Each process will take about 10-20 seconds to complete.
¾
At the completion of steps 1 and 2, disconnect the GG45 Calibration Adapters.
Step 3
¾
Insert the GG45 Permanent Link Adapters into both the Display and Remote
Handsets.
¾
From the DH Field Calibration screen, select START to begin the third calibration
step.
¾
Terminate the open end of the patchcord by connecting the GG45 Calibration
Load Terminator and select START again.
Step 4
¾
From the RH, press AUTOTEST to begin the fourth calibration step.
¾
Terminate the open end of the patchcord by connecting the GG45 Calibration
Load Terminator and press AUTOTEST again.
¾
When Step 4 is completed, the LANTEK is ready for testing Permanent Links.
www.vemco.pl
Содержание FIBERTEK
Страница 1: ...w w w v e m c o p l ...
Страница 132: ...Chapter 7 LANTEK REPORTER Software 7 21 w w w v e m c o p l ...